Development of Mineral insulation Cable
Project/Area Number |
06554006
|
Research Category |
Grant-in-Aid for Developmental Scientific Research (B)
|
Allocation Type | Single-year Grants |
Research Field |
素粒子・核・宇宙線
|
Research Institution | High Energy Accelerator Organization |
Principal Investigator |
TAKASAKI Minoru High Energy Accelerator Organization Institute of Particle and Nuclear Studies, Professor, 素粒子原子核研究所, 教授 (70044782)
|
Co-Investigator(Kenkyū-buntansha) |
NUMAJIRI Masaharu High Energy Accelerator Organization Institute of Particle and Nuclear Studies,, 放射線科学センター, 助手 (20189385)
IMAZATO Jun High Energy Accelerator Organization Institute of Particle and Nuclear Studies,, 素粒子原子核研究所, 教授 (40107686)
NOUMI Hiroyuki High Energy Accelerator Organization Institute of Particle and Nuclear Studies,, 素粒子原子核研究所, 助手 (10222192)
IEIRI Masaharu High Energy Accelerator Organization Institute of Particle and Nuclear Studies,, 素粒子原子核研究所, 助手 (50192472)
TANAKA Kazuhiro High Energy Accelerator Organization Institute of Particle and Nuclear Studies,, 素粒子原子核研究所, 助教授 (90171743)
伊藤 靖彦 日立電線(株)土浦工場製管部, 部長
横井 哲夫 (株)トーキン, 金属磁性事業部, 部長
|
Project Period (FY) |
1994 – 1995
|
Project Status |
Completed (Fiscal Year 1995)
|
Budget Amount *help |
¥9,300,000 (Direct Cost: ¥9,300,000)
Fiscal Year 1995: ¥5,100,000 (Direct Cost: ¥5,100,000)
Fiscal Year 1994: ¥4,200,000 (Direct Cost: ¥4,200,000)
|
Keywords | High Intensity Beam Line / Mineral Insulation Coil / Radiation Resistivity / Mineral Insulation / Ceramics Seal / Kaon Factory / Japan Hadron Facility / Nuclear Waste Transmutation / 電磁石 / 大強度ビーム輸送 / 大電流導体 / 無機絶縁ケーブル / 耐放射線 |
Research Abstract |
A new type of the Mineral Insulation Cable (MIC) of 2500A-class has been successfully manufactured. Though the initial design work was performed as 3000A-class MIC at the first year of the project, the final design was modified to be 2500A-class MIC because of worse processibility to the coil and of limited yield rate of the drawing stage. However it took relatively short time to fix the 2500A MIC design and the mass production was started immediately after the completion of the design work. A pair of electromagnet coils was wound by using the new 2500A MIC and was assembled as an electromagnet with an existing iron yoke. Test operation of the electromagnet was continued more than one year without any serious trouble. Results of this project have been reported at MT15 conference held at Beijing in 1997 and published in IEEE Transactions on Magnetics.
|
Report
(3 results)
Research Products