Budget Amount *help |
¥2,000,000 (Direct Cost: ¥2,000,000)
Fiscal Year 1995: ¥800,000 (Direct Cost: ¥800,000)
Fiscal Year 1994: ¥1,200,000 (Direct Cost: ¥1,200,000)
|
Research Abstract |
Before the experiment, through on-site studies about the apatment houses of HUDC,residents'demands and chronological change of interior layout were studied and characteristics of the would-be interior construction were setablished. Then, according to the characteristics, interior construction's main element, the partition panel was investigated in element separation, size determination, seam layout and etc.. After these, real-size models of partition panel were produced and panels'joints'suitability in various combination was checked. Furthermore, which design papers of interior construction being collected, patterns of partition's joint were processed and frequency of using a definite pattern was examined. Following this, methods of determining the interface between paritition and equipments such as the electric wires were observed and several possible methods were prusued. On the basis of studies mentioned above, while experiment using improved real-size partition panels being made, relation between structure wall and partition panel, feasibility of joints in different combination of panels, rationality of the system in construction as well as other characteristics were examined and problems were discoverd. Through experiments, about basicformation and shape of partition panel as well as suitability of consideration ofsize, some new discovery are made, at the same time, problem about the method of checking verticality of panelduring installation, the fundamental condition in relation with assuring total rationalization of interior construction, focuses of future study and etc.become obvious.
|