• Search Research Projects
  • Search Researchers
  • How to Use
  1. Back to previous page

Study of a scintillating fiber detector for a scattering experiment

Research Project

Project/Area Number 08454071
Research Category

Grant-in-Aid for Scientific Research (B)

Allocation TypeSingle-year Grants
Section一般
Research Field 素粒子・核・宇宙線
Research InstitutionHigh Energy Accelerator Research Organization

Principal Investigator

IEIRI Masaharu  Institute of Particle and Nuclear Studies, Hgh Energy Accelerator Research Organization, Research Associate, 素粒子原子核研究所, 助手 (50192472)

Co-Investigator(Kenkyū-buntansha) TANAKA Kazuhiro  Institute of Particle and Nuclear Studies, Hgh Energy Accelerator Research Organization, Associate Professor, 素粒子原子核研究所, 助教授 (90171743)
SAKUDA Makoto  Institute of Particle and Nuclear Studies, Hgh Energy Accelerator Research Organization, Associate Professor, 素粒子原子核研究所, 助教授 (40178596)
TAKASAKI Minoru  Institute of Particle and Nuclear Studies, Hgh Energy Accelerator Research Organization, Professor, 素粒子原子核研究所, 教授 (70044782)
NOUMI Hiroyuki  Institute of Particle and Nuclear Studies, Hgh Energy Accelerator Research Organization, Research Associate, 素粒子原子核研究所, 助手 (10222192)
大山 雄一  高エネルギー物理学研究所, 物理研究部, 助手 (30213896)
中村 健蔵  高エネルギー物理学研究所, 物理研究部, 教授 (10011735)
Project Period (FY) 1996 – 1998
Project Status Completed (Fiscal Year 1998)
Budget Amount *help
¥6,900,000 (Direct Cost: ¥6,900,000)
Fiscal Year 1998: ¥1,400,000 (Direct Cost: ¥1,400,000)
Fiscal Year 1997: ¥2,200,000 (Direct Cost: ¥2,200,000)
Fiscal Year 1996: ¥3,300,000 (Direct Cost: ¥3,300,000)
Keywordsneutrino beam line / neutrino / long base-line neutrino oscillation experiment / Current Transformer / Secondary Emission Chamber / Segmented Plate Ion Chamber / Gas Cherenkov / ビームモニター / CT(電流変換器) / SEC(二次粒子検出器) / SPIC(平板イオンチェンバー) / 電流変換器 / セカンダリ-エミッションチェンバー / 平板イオンチェンバー / ニュートリノビーム / 水チェレンコフ検出器 / イオンチェンバー
Research Abstract

Objectives of this research are
・ To design and test basic characteristics of several types of detectors for primary protons and secondary particles at the neutrino beam line
・ To develop and establish a method of the monitoring and tuning system of the fast extracted primary proton beam for the efficient (neutrino) beam transportation.
Several types of detectors such as CT (Current Transformer), SPIC (Segmented Plate Ion Chamber), SEC (Secondary Emission Chamber) and GC (Gas Cherenkov) are designed and tested.
These detectors are installed and being used at the present primary proton beam line for the long base-line neutrino oscillation experiment.
The data acquisition program for detector signals has been developed and the beam control procedure has been established. On June 19, 1999, 6:42 PM, the first neutrino event was observed due to the KEK neutrino beam in the SuperKamiokande detector. This was the first demonstration that a particle that had been produced artificially and traversed 250km in Earth was detected.
This research played a key role for the efficient beam transportation of neutrinos which are hardly detected and should fly along the distance of 250 km.

Report

(4 results)
  • 1998 Annual Research Report   Final Research Report Summary
  • 1997 Annual Research Report
  • 1996 Annual Research Report
  • Research Products

    (12 results)

All Other

All Publications (12 results)

  • [Publications] M.Ieiri et al.: "Magnetic Horn for a Long-Baseline Neutorino Oscillation Experiment at KEK"Proc.of the 11th Symposium on Accelerator Science and Technology. 377-379 (1997)

    • Description
      「研究成果報告書概要(和文)」より
    • Related Report
      1998 Final Research Report Summary
  • [Publications] Y.Yamanoi et al.: "Large Horn Magnet at the KEK Neutrino Beam Line"Proc.of 15th International Conference on Magnet Technology. 711-714 (1997)

    • Description
      「研究成果報告書概要(和文)」より
    • Related Report
      1998 Final Research Report Summary
  • [Publications] Y.Suzuki et al.: "Control and Timing of the 250kA Pulse Magnetic Horm"Proc. of International Conference on Accelerator and Large Experimental Physics Control System. 266-268 (1997)

    • Description
      「研究成果報告書概要(和文)」より
    • Related Report
      1998 Final Research Report Summary
  • [Publications] T.Kobayashi: "K2K:KEK to Kaimoka Long Baseline Neutrino Oscillation Experiment"AIP Conference Proceedings. 435. 391-397 (1997)

    • Description
      「研究成果報告書概要(和文)」より
    • Related Report
      1998 Final Research Report Summary
  • [Publications] M.Ieiri et al.: "Neutrino beam line for a long-baseline neutrino oscillation experiment at KEK"Proc.of the 1st Asian Part. Accel. Conf. 579-581 (1998)

    • Description
      「研究成果報告書概要(和文)」より
    • Related Report
      1998 Final Research Report Summary
  • [Publications] H.Noumi et al.: "Precision Positioning of SuperKamiokande with GPS for a Long-Baseline Neutrino Oscillation Experiment"Nucl.Instrm .& Meth. A398. (1997)

    • Description
      「研究成果報告書概要(和文)」より
    • Related Report
      1998 Final Research Report Summary
  • [Publications] M.Ieiri et al: "Magnetic Horn for a Long-Baseline Neutrino Oscillation Experiment at KEK"Proc. of the 11th Symposium on Accelerator Science and Technology. 377-379 (1997)

    • Description
      「研究成果報告書概要(欧文)」より
    • Related Report
      1998 Final Research Report Summary
  • [Publications] Y. Yamanoi et al: "Large Horn Magnet at the KEK Neutrino Beam Line"Proc.of 15th International Conference on Magnet Technology. 711-714 (1997)

    • Description
      「研究成果報告書概要(欧文)」より
    • Related Report
      1998 Final Research Report Summary
  • [Publications] Y. Suzuki et al: "Control and Timing of the 250 kA Pulse Magnetic Horn"Proc. Of International Conference on Accelerator and Large Experimental Physics Control System. 266-268 (1997)

    • Description
      「研究成果報告書概要(欧文)」より
    • Related Report
      1998 Final Research Report Summary
  • [Publications] T. Kobayashi: "K2K: KEKto Kaimoka Long Baseline Neutrino Oscillation Experiment"AIP Conference Proceedings. 435. 391-397 (1997)

    • Description
      「研究成果報告書概要(欧文)」より
    • Related Report
      1998 Final Research Report Summary
  • [Publications] M. Ieiri et al: "Neutrino beam line for a long-baseline neutrino oscillation Proc. Of the 1st Asian Part. Accel. Conf."experiment at KEK. 579-581 (1998)

    • Description
      「研究成果報告書概要(欧文)」より
    • Related Report
      1998 Final Research Report Summary
  • [Publications] H. Noumi et al: "Precision Positioning of SuperKamiokande with GPS for a Long-Baseline, Neutrino Oscillation Experiment"Nucl. Instrm. & Meth. A398-A398 (1997)

    • Description
      「研究成果報告書概要(欧文)」より
    • Related Report
      1998 Final Research Report Summary

URL: 

Published: 1996-04-01   Modified: 2016-04-21  

Information User Guide FAQ News Terms of Use Attribution of KAKENHI

Powered by NII kakenhi