• Search Research Projects
  • Search Researchers
  • How to Use
  1. Back to previous page

A study on the prevention of bed material scouring with porous protection work

Research Project

Project/Area Number 08680488
Research Category

Grant-in-Aid for Scientific Research (C)

Allocation TypeSingle-year Grants
Section一般
Research Field Natural disaster science
Research InstitutionSetsunan University

Principal Investigator

SAWAI Kenji  Setsunan University, Faculty of Engineering, Professor, 工学部, 教授 (70109073)

Project Period (FY) 1996 – 1997
Project Status Completed (Fiscal Year 1997)
Budget Amount *help
¥2,100,000 (Direct Cost: ¥2,100,000)
Fiscal Year 1997: ¥700,000 (Direct Cost: ¥700,000)
Fiscal Year 1996: ¥1,400,000 (Direct Cost: ¥1,400,000)
Keywordsgravel bed protection work / rich-in-nature river work / vane work mild slope bank / bend channel / 緩傾斜河岸 / 弯曲水路 / 変曲水路
Research Abstract

There are some methods for river bed and bank protection. Recently, in view of ecological preservation, porous protection work is noticed. It is preferable to keep big pores in order to maintain the habitat. However, it is apt to be suffered from scouring.
In this study, it is tried to protect the stream bed with multi-layr gravel sheet, whose diameter reduces downwords. The total thickness of the gravel layrs can be reduced by selecting the suitable combination of gravel size and thickness of the respective layr.
On the other hand, it is also important to reduce the tractive force itself in order to prevent bed and bank scouring. In this study, it is tried to apply vane work for the protection of mild slope bank in a bend channel, where, bank erosion occurs without any protection.
In the experiment using the submerged vanes with the height, length, spacing and angle selected to min : mize the scouring in case of rectangular channel with non-erodible bank, bank erosion was not reduced. By increasing the vane height up to water surface and changing the angle from negative to positive, bank erosion was much reduced, but local scouring around vanes increased. By increasing the length and spacing of vanes, both of bank erosion and bed scouring were reduced.

Report

(3 results)
  • 1997 Annual Research Report   Final Research Report Summary
  • 1996 Annual Research Report
  • Research Products

    (4 results)

All Other

All Publications (4 results)

  • [Publications] 澤井健二・永田素基・早瀬洋: "階層構造を有する石礫護床工を用いた洗掘制御に関する研究" 土木学会第51回年次学術講演会講演概要集. 第II部. 120-121 (1996)

    • Description
      「研究成果報告書概要(和文)」より
    • Related Report
      1997 Final Research Report Summary
  • [Publications] Sawai, K., M.Nagata and H.Hayase: "A study on scour control by means of multi layr gravel protection work" Proceedings of 51st annual meeting. JSCE,Vol. II. 120-121 (1996)

    • Description
      「研究成果報告書概要(欧文)」より
    • Related Report
      1997 Final Research Report Summary
  • [Publications] 澤井健二・永田素基・早瀬 洋: "階層構造を有する石礫護床工を用いた洗掘制御に関する研究" 土木学会第51回年次学術講演会講演概要集. 第II部. 120-121 (1996)

    • Related Report
      1997 Annual Research Report
  • [Publications] 澤井 健二・永田 素基・早瀬 洋: "階層構造を有する石礫護床工を用いた洗掘制御に関する研究" 土木学会第51回年次学術講演会講演概要集. 第II部. 120-121 (1996)

    • Related Report
      1996 Annual Research Report

URL: 

Published: 1996-04-01   Modified: 2016-04-21  

Information User Guide FAQ News Terms of Use Attribution of KAKENHI

Powered by NII kakenhi