The Research on Automatic Restoration System in Electric Power System Failure

Research Project

Project/Area Number 09555090
Research Category

Grant-in-Aid for Scientific Research (B)

Allocation TypeSingle-year Grants
Section展開研究
Research Field 電力工学・電気機器工学
Research InstitutionHiroshima Institute of Technology

Principal Investigator

NAGATA Takeshi  Hiroshima Institute of Technology, 工学部, 助教授 (40218003)

Project Period (FY) 1997 – 1999
Project Status Completed (Fiscal Year 1999)
Budget Amount *help
¥3,800,000 (Direct Cost: ¥3,800,000)
Fiscal Year 1999: ¥500,000 (Direct Cost: ¥500,000)
Fiscal Year 1998: ¥1,000,000 (Direct Cost: ¥1,000,000)
Fiscal Year 1997: ¥2,300,000 (Direct Cost: ¥2,300,000)
Keywordspower system / power system restoration / mathematical programming / expert system
Research Abstract

The stable supply of electric power makes the basis which supports present society activity, and many measures are done in the each department which constitutes electric power system for the stable maintenance of the supply reliability. However, the wide power cut is generated by natural or man-made disaster as reported even in today in the newspaper, and has the considerable time for the restoration. In this study, by supporting accident restoration of the power system operator in order to overcome such situation, following items were studied on the practical system for the quick restoration.
1. The examination on the method for efficiently determining optimum target network configuration in about 30 seconds, which are the design objective value in the practical use, is carried out.
2. The system which can evaluate the proposal method by the setting of various condition is constructed.
To begin with, three methods were proposed based on the mathematical programming for the item on superscription (1). That is to say, determination method of target configuration using Mixed Integer Programming (MIP) ; the method by the combined use of Linear Programming and MIP ; the method for introduction then, the strategy of power system operator at "restorative operation cost", was proposed. It became possible that 30 seconds which are the design objective value of the preparation of target network configuration were almost cleared with the final method, even if the mathematical programming is applied. From the above result, it seemed to obtain the possibility of the practical application of restorative operation using mathematical programming.
Next, power system restoration system using OSF/Motif was developed on the item on (2). This system has six functions of "power system model preparation", "screen display", "power cut identification", "system analysis", "target network configuration preparation", and "restoration procedure preparation".

Report

(4 results)
  • 1999 Annual Research Report   Final Research Report Summary
  • 1998 Annual Research Report
  • 1997 Annual Research Report
  • Research Products

    (11 results)

All Other

All Publications (11 results)

  • [Publications] 永田武,金鈞,安岡道弘,畠山秀一: "混合整数計画法による配電システム事故復旧問題の解法"電気学会電力技術研究会資料. PE-98-47. 13-17 (1998)

    • Description
      「研究成果報告書概要(和文)」より
    • Related Report
      1999 Final Research Report Summary
  • [Publications] 永田武,金鈞,安岡道弘,畠山秀一: "混合整数計画法による配電システム復旧問題の検討"電気学会B部門全国大会. No. 183. 372-373 (1998)

    • Description
      「研究成果報告書概要(和文)」より
    • Related Report
      1999 Final Research Report Summary
  • [Publications] 金鈞,永田武,畠山秀一: "復旧戦略を導入した配電システム事故復旧の数理計画的方式"電気学会B部門全国大会. No. 200. 510-511 (1999)

    • Description
      「研究成果報告書概要(和文)」より
    • Related Report
      1999 Final Research Report Summary
  • [Publications] 畠山秀一,金鈞,永田武: "混合整数計画法による配電系統事故復旧の高速化方法"電気学会電力技術研究会資料. PE-99-9. 43-48 (1999)

    • Description
      「研究成果報告書概要(和文)」より
    • Related Report
      1999 Final Research Report Summary
  • [Publications] T. Nagata, J. Jin, H. Sasaki: "A Mathematical Programming Approach to Service Restoration for Distribution Systems"International Conference on Electrical Engineering. B5-08. 471-474 (1999)

    • Description
      「研究成果報告書概要(和文)」より
    • Related Report
      1999 Final Research Report Summary
  • [Publications] 永田武,金鈞,畠山秀一,佐々木博司: "復旧戦略を導入した配電系統事故復旧"電気学会論文誌. Vol. 120-C. 229-235 (2000)

    • Description
      「研究成果報告書概要(和文)」より
    • Related Report
      1999 Final Research Report Summary
  • [Publications] Takashi Nagata, et al.: "A Mathematical Programming Approach to Service Restoration for Distribution Systems"Proceedings International Conference on Electrical Engineering. vol.1. 471-474 (1999)

    • Description
      「研究成果報告書概要(欧文)」より
    • Related Report
      1999 Final Research Report Summary
  • [Publications] Takashi Nagata, et al.: "A Mathematical Programming Approach to Service Restoration for Distribution Systems"The Transaction of The Institute of Electrical Engineers of Japan. vol.120-c. 229-135 (2000)

    • Description
      「研究成果報告書概要(欧文)」より
    • Related Report
      1999 Final Research Report Summary
  • [Publications] 金鈞,永田武,畠山秀一: "復旧戦略を導入した配電システム事故復旧の数理計画的方式"電気学会B部門全国大会. No.200. 510-511 (1999)

    • Related Report
      1999 Annual Research Report
  • [Publications] T.Nagata,J.Jin,H.Sasaki: "A Mathematical Programming Approach to Service Restoration for Distribution Systems"International Conference on Electrical Engineering. NO:B5-08. 471-474 (1999)

    • Related Report
      1999 Annual Research Report
  • [Publications] 永田武,金鈞,畠山秀一,佐々木博司: "復旧戦略を導入した配電系統事故復旧"電気学会論文誌. Vol.120-C・2. 229-235 (2000)

    • Related Report
      1999 Annual Research Report

URL: 

Published: 1997-04-01   Modified: 2016-04-21  

Information User Guide FAQ News Terms of Use Attribution of KAKENHI

Powered by NII kakenhi