Optimization of Repair and Recover of Infrastructure Systems Considering Life-Cycle Cost

Research Project

Project/Area Number 10044185
Research Category

Grant-in-Aid for Scientific Research (B).

Allocation TypeSingle-year Grants
Section一般
Research Field 構造工学・地震工学
Research InstitutionKansai University

Principal Investigator

FURUTA Hitoshi  Kansai University, Faculty of Informatics, Professor, 総合情報学部, 教授 (70109031)

Co-Investigator(Kenkyū-buntansha) DOGAKI Masahiro  Kansai University Faculty of Engineering, Professor, 工学部, 教授 (60067759)
SUGIMOTO Hiroyuki  Hokkai-Gakuen University, Faculty of Engineering, Professor, 工学部, 教授 (70002946)
YAO James  米国テキサス&M大学, 土木工学科, 教授
ARORA Jaber  米国アイオツ大学, 土木工学科, 教授
FRANPOVOL Da  米国コロラド大学, 土木工学部, 教授
Project Period (FY) 1998 – 2000
Project Status Completed (Fiscal Year 2000)
Budget Amount *help
¥6,900,000 (Direct Cost: ¥6,900,000)
Fiscal Year 2000: ¥2,600,000 (Direct Cost: ¥2,600,000)
Fiscal Year 1999: ¥2,000,000 (Direct Cost: ¥2,000,000)
Fiscal Year 1998: ¥2,300,000 (Direct Cost: ¥2,300,000)
KeywordsLife-Cycle Cost / Optimization / Genetic Algorithm / Uncertainty / Maintenance / Durability / Infrastructure / User Cost / 耐久性 / 補修 / 補強 / ライフサイクル / 復旧 / 信頼性 / 構造物 / 道路
Research Abstract

Up to the last year, research had been made on the definition of life-cycle cost and its application to the maintenance of infrastructure systems. An attempt was made to develop an optimal maintenance system using the concept of life-cycle cost. Furthermore, the system was improved for practical use and its applicability was demonstrated using the real data. Then, the reliability theory was introduced so as to deal with various uncertainties regarding the deterioration and environments.
This year, it was intended to complete the system and provide us a practical maintenance plan which is reliable and sufficient for functionality. In order to handle the uncertainties, a new system was developed, which does not explicitly use the probability theory. Since the probabilistic method is often difficult for practitioners to understand, the system employed a new optimization method to deal with the uncertainties. Applying the genetic algorithm proposed by Tamaki et at., it is possible to introduce the effects of uncertain factors with respect to the prediction of deterioration and the change of environmental conditions without using the probability concepts. On the other hand, another system was developed, which can provide a practical solution for maintenance problems of large and complicated structures. Using the genetic algorithm based upon the concept of virus evolution, it can be done to obtain each maintenance plan for individual elements or members of a structure as well as the total maintenance plan for overall structure. This system can reduce the computation time and memory. Through the research, it is concluded that the calculation of user cost is quite important to estimate the life-cycle cost appropriately. Therefore, great attention was paid to the definition and calculation of user cost and their validity was proved by applying them to a road network in Hokkaido.

Report

(4 results)
  • 2000 Annual Research Report   Final Research Report Summary
  • 1999 Annual Research Report
  • 1998 Annual Research Report
  • Research Products

    (17 results)

All Other

All Publications (17 results)

  • [Publications] 杉本博之,首藤諭,後藤晃,渡辺忠朋,田村亨: "北海道の橋梁のユーザーコストとBMSに関する一試み"第57回北海道支部論文報告集. (印刷中). (2001)

    • Description
      「研究成果報告書概要(和文)」より
    • Related Report
      2000 Final Research Report Summary
  • [Publications] 杉本博之,後藤晃,首藤諭,渡辺忠朋,田村亨: "ユーザーコストを考慮するLCCと割引率の関係について"第57回北海道支部論文報告集. (印刷中). (2001)

    • Description
      「研究成果報告書概要(和文)」より
    • Related Report
      2000 Final Research Report Summary
  • [Publications] 古田,広兼,斎藤,田丸,前田: "不確実性を考慮したLCCに基づく構造物の維持管理"第50期日本材料学会学術講演会. (印刷中). (2001)

    • Description
      「研究成果報告書概要(和文)」より
    • Related Report
      2000 Final Research Report Summary
  • [Publications] H.Furuta,M.Hirokane,M.Saito: "Life-Cycle Cost Based Maintenance of Infrastructure Systems Considering Prediction Uncertainties"The First US-Japan Joint Workshop on Life-Cycle Cost Analysis and Design. 20-28 (2000)

    • Description
      「研究成果報告書概要(和文)」より
    • Related Report
      2000 Final Research Report Summary
  • [Publications] M.Dogaki,H.Furuta,I.Tsukiyama,D.Frangopol: "Optimal Planning for Repairing of Reinforced Concrete Decks on Highway Network"The First US-Japan Joint Workshop on Life-Cycle Cost Analysis and Design. 69-78 (2000)

    • Description
      「研究成果報告書概要(和文)」より
    • Related Report
      2000 Final Research Report Summary
  • [Publications] H.Sugimoto et al.: "An Attempt on User Cost and BMS for Bridges in Hokkaido (in Japanese)"Proc. of 57th JSCE Meeting, Hokkaido Branch. (in press). (2001)

    • Description
      「研究成果報告書概要(欧文)」より
    • Related Report
      2000 Final Research Report Summary
  • [Publications] H.Sugimoto et al.: "Relation between Discount Rate and LCC Considering User Cost (in Japanese)"Proc. of 57th JSCE Meeting, Hokkaido Branch. (in press). (2001)

    • Description
      「研究成果報告書概要(欧文)」より
    • Related Report
      2000 Final Research Report Summary
  • [Publications] H.Furuta, M.Hirokane, M.Saito et al.: "Maintenance of Structures Considering Uncertainties (in Japanese)"The 50th Meeting of JSMS. (in Press). (2001)

    • Description
      「研究成果報告書概要(欧文)」より
    • Related Report
      2000 Final Research Report Summary
  • [Publications] H.Furuta, M.Hirokane, M.Saito: "Life-Cycle Cost Based Maintenanc Infrastructure Systems Considering Prediction Uncertainties"The First US-Japan Joint Workshop on Life-Cycle Cost Analysis and Design. 20-28 (2000)

    • Description
      「研究成果報告書概要(欧文)」より
    • Related Report
      2000 Final Research Report Summary
  • [Publications] M.Dogaki, H.Furuta, I.Tsukiyama: "D.Frangopol, Optimal Planning for Repai of Reinforced Concrete Decks on Highway Network"The First US-Japan Joint Workshop on Life-Cycle Cost Analysis and Design. 69-78 (2000)

    • Description
      「研究成果報告書概要(欧文)」より
    • Related Report
      2000 Final Research Report Summary
  • [Publications] 杉本博之,首藤諭,後藤晃,渡辺忠朋,田村亨: "北海道の橋梁のユーザーコストとBMSに関する一試み"第57回北海道支部論文報告集. (印刷中). (2001)

    • Related Report
      2000 Annual Research Report
  • [Publications] 杉本博之,後藤晃,首藤諭,渡辺忠朋,田村亨: "ユーザーコストを考慮するLCCと割引率の関係について"第57回北海道支部論文報告集. (印刷中). (2001)

    • Related Report
      2000 Annual Research Report
  • [Publications] 古田,広兼,斎藤,田丸,前田: "不確実性を考慮したLCCに基づく構造物の維持管理"第50期日本材料学会学術講演会. (印刷中). (2001)

    • Related Report
      2000 Annual Research Report
  • [Publications] H. Furuta, D. Frangoul, M. Saito: "Life-Cycle Cost Design of Deterionating Bridges Using Genetic Algorithm"Structural Engineering in the 21st Century. 243-246 (1999)

    • Related Report
      1999 Annual Research Report
  • [Publications] 古田,能勢,大村,堂垣: "鋼橋RC床版の道路ネットワークを考慮した補修順位決定支援システムの構築"構造工学論文集. 46(印刷中). (2000)

    • Related Report
      1999 Annual Research Report
  • [Publications] 古田,能勢,築山,堂垣: "道路網を勘案した鋼橋の最適補修計画支援システム"平成12年度土木学会関西支部年次講演会. (印刷中). (2000)

    • Related Report
      1999 Annual Research Report
  • [Publications] H. Furuta, D. Fragopal: "Life-Cycle Cost Design of Deteriocating Bridges Using Genetic Algerithm" Proceeding of Structive Congress '99. (1999)

    • Related Report
      1998 Annual Research Report