Project/Area Number |
12450203
|
Research Category |
Grant-in-Aid for Scientific Research (B)
|
Allocation Type | Single-year Grants |
Section | 一般 |
Research Field |
交通工学・国土計画
|
Research Institution | HOKKAIDO UNIVERSITY |
Principal Investigator |
SATO Keiichi Hokkaido Univ., Grad. School of Eng., Prof., 大学院・工学研究科, 教授 (00091455)
|
Co-Investigator(Kenkyū-buntansha) |
TAMEKUNI Takatoshi Ashikaga Institute of Tech., Asso. Prof., 工学部, 助教授 (70285766)
SHIMIZU Koushirou Akita Univ., Prof., 工学資源学部, 教授 (30006655)
AKANO Shin-ei Hokkaido Univ., Grad. School of Eng., Asso. Prof., 大学院・工学研究科, 助教授 (60221355)
TAKEUCHI Denshi Gifu Univ., Prof., 地域科学部, 教授 (70065283)
FURUYA Hideki Tsukuba Univ, Assi. Prof., 社会工学系, 講師 (80252013)
|
Project Period (FY) |
2000 – 2001
|
Project Status |
Completed (Fiscal Year 2001)
|
Budget Amount *help |
¥13,100,000 (Direct Cost: ¥13,100,000)
Fiscal Year 2001: ¥4,600,000 (Direct Cost: ¥4,600,000)
Fiscal Year 2000: ¥8,500,000 (Direct Cost: ¥8,500,000)
|
Keywords | large scale infrastructure / civil engineering heritage / project evaluation / Seikan Tunnel / cost-benefit ratio / net present value |
Research Abstract |
This study aims that postwar civil engineering projects, that is large scale infrastructures, are evaluated fairly throughout the future. Though evaluations of the civil engineering heritages have been carried out until now, these facilities have been limited before 1945. This study is, taking up the large scale infrastructures after 1945. The documents which clarified the planning process were collected and saved, and the interview surveys for the interest parties who exists were carried out. Intended infrastructures are Seikan Tunnel, Otaru Canal, Hachirougata reclamation, Tadami River electric power development, Metropolitan Expressway, Meishin Expressway, Trans-Tokyo Bay Highway, Narita Airport, Tokaido Shinkansen, Honshu-Shikoku bridges, Kanmon Bridge and Tunnel. Research partakers all over Japan have studied each end. Main accomplishments by this study are as follows. 1) Social environment changes were coordinated in the time of planning and afterwards. 2) The following were shown in evaluation of large scale social infrastructures : Not only economical index but also civil engineering historical evaluation is important. 3) For planning and realization of the large scale infrastructure, it was shown that reliable consensus building process was necessary.
|