• Search Research Projects
  • Search Researchers
  • How to Use
  1. Back to previous page

A Study on Integrated Process Planning and Scheduling System for Holonic Manufacturing System

Research Project

Project/Area Number 13650126
Research Category

Grant-in-Aid for Scientific Research (C)

Allocation TypeSingle-year Grants
Section一般
Research Field 機械工作・生産工学
Research InstitutionOsaka Prefecture University

Principal Investigator

SUGIMURA Nobuhiro  Osaka Prefecture Univ., Professor, 大学院・工学研究科, 教授 (80135813)

Co-Investigator(Kenkyū-buntansha) TANIMIZU Yoshitaka  Osaka Prefecture Univ., Research Associate, 大学院・工学研究科, 助手 (60275279)
SUGIMOTO Masakatsu  Osaka Prefecture Univ., Associate Professor, 大学院・工学研究科, 助教授 (70081239)
Project Period (FY) 2001 – 2002
Project Status Completed (Fiscal Year 2002)
Budget Amount *help
¥1,100,000 (Direct Cost: ¥1,100,000)
Fiscal Year 2002: ¥1,100,000 (Direct Cost: ¥1,100,000)
KeywordsHolonic manufacturing, system / Modeling / Simulation / Real time scheduling / Process planning system / Autonomous decision-making
Research Abstract

(1) Development of CAM system for plate parts.
A CAM system has been developed to generate NC data for drilling and reaming processes of the plates of the injection molds and the die-casting dies, based on the input information about the CAD data of the plates given in the IGES and/or DXF formats. The machining technology data for the drilling and the reaming processes are investigated and stored in the machining technology database. The database gives the relationships between the geometric and technological information about the holes to be machined and the machining information about the machining processes, such as the tools, the cutting conditions and the cutter location data.
(2) Development of distributed scheduling system for HMS
An object-oriented modeling technique is adopted to represent the holonic components of the manufacturing systems including workpieces and manufacturing resources. An object-oriented simulation system is developed to represent and to simulate real-time scheduling processes in the holonic manufacturing system. A set of simulation is carried our to verify the decision rules for the real-time scheduling from the viewpoint of the total make-span and the adaptability to the failure of the manufacturing resources.
(3) Verifications of the developed system.
The systems developed in the research have been verified from the viewpoint of both the process planning and scheduling in the holonic manufacturing systems

Report

(3 results)
  • 2002 Annual Research Report   Final Research Report Summary
  • 2001 Annual Research Report
  • Research Products

    (19 results)

All Other

All Publications (19 results)

  • [Publications] 谷水義隆, 岩村幸治, 杉村延広, 岩田一明: "生産システムの多目的モデリングに関する研究(第3報,階層分散型生産システムのコンカレント・リスケジューリング)"日本機械学会論文集C編. 67,654. 283-288 (2001)

    • Description
      「研究成果報告書概要(和文)」より
    • Related Report
      2002 Final Research Report Summary
  • [Publications] N.Sugimura, R.Hino, T.Moriwaki: "Integrated Process Planning and Scheduling in Holonic Manufacturing System"Proc. of the 2001 IEEE International Symposium on Assembly and Task Planning. 250-255 (2001)

    • Description
      「研究成果報告書概要(和文)」より
    • Related Report
      2002 Final Research Report Summary
  • [Publications] S.Rais, N.Sugimura, A.Kokubun: "Study on Process Planning System for Holonic Manufacturing (Selection of Machining Sequences and Sequences of Machining Equipment)"JSME International Journal Series C. 45,2. 527-533 (2002)

    • Description
      「研究成果報告書概要(和文)」より
    • Related Report
      2002 Final Research Report Summary
  • [Publications] N.Sugiyama, Y.Tanimizu, K.Iwamura: "A Study on Real-time Scheduling for Holonic Manufacturing System"Proc. of the 35th CIRP International Seminar on Manufacturing Systems. 213-218 (2002)

    • Description
      「研究成果報告書概要(和文)」より
    • Related Report
      2002 Final Research Report Summary
  • [Publications] N.Sugiyama, Y.Tanimizu, K.Iwamura: "A Study on Real-time Scheduling for Holonic Manufacturing System"Proc. of International Symposium on Scheduling 2002. 113-116 (2002)

    • Description
      「研究成果報告書概要(和文)」より
    • Related Report
      2002 Final Research Report Summary
  • [Publications] K.Iwamura, Y.Tanimizu, N.Sugiyama: "A Study on Real-time Scheduling Methods in Holonic Manufacturing Systems"Proc. of the 5th International Conference on Design of Information Infrastructure Systems for Manufacturing 2002. 3-14 (2002)

    • Description
      「研究成果報告書概要(和文)」より
    • Related Report
      2002 Final Research Report Summary
  • [Publications] N. Sugimura, R. Hino and T. Moriwaki: "Integrated Process Planning and Scheduling in Holonic Manufacturing System"Proc. of the 2001 IEEE International Symposium on Assembly and Task Planning. 250-255 (2001)

    • Description
      「研究成果報告書概要(欧文)」より
    • Related Report
      2002 Final Research Report Summary
  • [Publications] S. Rais, N. Sugimura and A. Kokubun: "Study on Process Planning System for Holonic Manufacturing (Selection of Machining Sequences and Sequences of Machining Equipment)"JSME International Journal Series C. 45,2. 527-533 (2002)

    • Description
      「研究成果報告書概要(欧文)」より
    • Related Report
      2002 Final Research Report Summary
  • [Publications] N. Sugimura, Y. Tanimizu and K. Iwamura: "A Study on Real-time Scheduling for Holonic Manufacturing System"Proc. of The 35th CIRP International Seminar on Manufacturing Systems. 213-218 (2002)

    • Description
      「研究成果報告書概要(欧文)」より
    • Related Report
      2002 Final Research Report Summary
  • [Publications] N. Sugimura, Y. Tanimizu and K. Iwamura: "A Study on Real-time Scheduling for Holonic Manufacturing System"Proc. of International Symposium on Scheduling 2002. 113-116 (2002)

    • Description
      「研究成果報告書概要(欧文)」より
    • Related Report
      2002 Final Research Report Summary
  • [Publications] K. Iwamura, Y, Tanimizu and N. Sugimura: "A Study on Real-time Scheduling Methods in Holonic Manufacturing Systems"Proc. of the 5th International Conference on Design of Information Infrastructure Systems for Manufacturing 2002. 3-14 (2002)

    • Description
      「研究成果報告書概要(欧文)」より
    • Related Report
      2002 Final Research Report Summary
  • [Publications] 谷水義隆, 岩村幸治, 杉村延広, 岩田一明: "生産システムの多目的モデリングに関する研究(第3報,階層分散型生産システムのコンカレント・リスケジューリング)"日本機械学会論文集C編,67,654. 67,654. 283-288 (2001)

    • Related Report
      2002 Annual Research Report
  • [Publications] N.Sugimura, R.Hino, T.Moriwaki: "Integrated Process Planning and Scheduling in Holonic Manufacturing System"Proc. of the 2001 IEEE International Symposium on Assembly and Task Planning. 250-255 (2001)

    • Related Report
      2002 Annual Research Report
  • [Publications] S.Rais, N.Sugimura, A.Kokubun: "Study on Process Planning System for Holonic Manufacturing (Selection of Machining Sequences and Sequences of Machining Equipment)"JSME International Journal Series C. 45,2. 527-533 (2002)

    • Related Report
      2002 Annual Research Report
  • [Publications] N.Sugimura Y.Tanimizu, K.Iwamura: "A Study on Real-time Scheduling for Holonic Manufacturing System"Proc. of The 35th CIRP International Seminar on Manufacturing Systems. 213-218 (2002)

    • Related Report
      2002 Annual Research Report
  • [Publications] N.Sugimura Y.Tanimizu, K.Iwamura: "A Study on Real-time Scheduling for Holonic Manufacturing Systems"Proc. of International Symposium on Scheduling 2002. 113-116 (2002)

    • Related Report
      2002 Annual Research Report
  • [Publications] K.Iwamura Y.Tanimizu, N.Sugimura: "A Study on Real-time Scheduling Methods in Holonic Manufacturing Systems"Proc. of the 5th International Conference on Design of Information Infrastructure Systems for Manufacturing 2002. 3-14 (2002)

    • Related Report
      2002 Annual Research Report
  • [Publications] 谷水義隆, 岩村幸治, 杉村延広, 岩田一明: "生産システムの多目的モデリングに関する研究(第3報,階層分散型生産システムのコンカレント・リスケジューリング)"日本機械学会論文集C編. 67・654. 283-288 (2001)

    • Related Report
      2001 Annual Research Report
  • [Publications] N.Sugimura, R.Hino, T.Moriwaki: "Integrated Process Planning and Scheduling in Holonic Manufacturing Systems"Proc. of the 2001 IEEE International Symposium on Assembly and Task Planning. 250-255 (2001)

    • Related Report
      2001 Annual Research Report

URL: 

Published: 2002-04-01   Modified: 2016-04-21  

Information User Guide FAQ News Terms of Use Attribution of KAKENHI

Powered by NII kakenhi