• Search Research Projects
  • Search Researchers
  • How to Use
  1. Back to previous page

Integrated Logistic System of Delivery and Pickup Planning under Stochastic Demand Condition

Research Project

Project/Area Number 14580474
Research Category

Grant-in-Aid for Scientific Research (C)

Allocation TypeSingle-year Grants
Section一般
Research Field 社会システム工学
Research InstitutionTokyo Institute of Technology

Principal Investigator

TSAO De-bi  Tokyo Institute of Technology, Dept.of IE&Magt., Asso.Prof., 大学院・社会理工学研究科, 助教授 (30242275)

Co-Investigator(Kenkyū-buntansha) SUZUKI Sadami  Tokyo Institute of Technology, Dept.of IE&Magt., Research Associate, 大学院・社会理工学研究科, 助手 (50323811)
ENKAWA Takao  Tokyo Institute of Technology, Dept.of IE&Magt., Prof., 大学院・社会理工学研究科, 教授 (70092541)
Project Period (FY) 2002 – 2003
Project Status Completed (Fiscal Year 2003)
Budget Amount *help
¥3,600,000 (Direct Cost: ¥3,600,000)
Fiscal Year 2003: ¥1,400,000 (Direct Cost: ¥1,400,000)
Fiscal Year 2002: ¥2,200,000 (Direct Cost: ¥2,200,000)
KeywordsInventory / Delivery Schedule / Reverse Logistics / IRP / VRP / MPIRP / ロジスティクス / Reverse Logistic / 他期間配送計画
Research Abstract

In this research, we broke down the main subject, Integrated Logistic System of Delivery and Pickup Planning under Stochastic Demand Condition, into five sub problems, i.e., (1) production and inventory control problem, (2) delivery scheduling problem, (3) integrated multiple periods inventory routing problem, (4) integrated delivery and pickup scheduling problem and (5) project management problem. With respect to the sub problem (1), we developed a new model dealing the stochastic demand and risk pooling inventory control model. The paper was accepted by Naval Research Logistics. For the sub problem (2) we developed a new method to evaluate cost increase when we increase delivery numbers for each retailer. Our method can reduce the time of grouping process of the delivery schedule more than 50 percent compare to traditional TSP approach. With respect to the sub problem (3), we developed several model and applications for one truck problem, with and without time window constraints. These research outcomes were submitted to international journals and some of them are under reviewing and others are accepted to publish. For the sub problem (4), we carried out a smart modeling as well as the algorithm using Tabu search approach. Our model out performs compared to current MPIRP model. An academic research paper was submitted to operations research spectrum. Finally, we also developed project management models for the implementation process of the models concerning above sub problems (1)-(4). Four papers were published or accepted for publication (see details in reference lists)

Report

(3 results)
  • 2003 Annual Research Report   Final Research Report Summary
  • 2002 Annual Research Report
  • Research Products

    (38 results)

All Other

All Publications (38 results)

  • [Publications] Ahmad Rusdiansyah, De-bi Tsao: "An Integrated Model, of the Periodic Delivery Problems for Vending-machine Supply Chains"Journal of Food Engineering. (掲載予定). (2004)

    • Description
      「研究成果報告書概要(和文)」より
    • Related Report
      2003 Final Research Report Summary
  • [Publications] De-bi Tsao, E.A.Silver: "A Dynamic Allocation Heuristic for Centralized Safety Stock"Naval Research Logistic. (掲載予定). (2004)

    • Description
      「研究成果報告書概要(和文)」より
    • Related Report
      2003 Final Research Report Summary
  • [Publications] Ahsan M.K.De-bi Tsao: "A Composite Multi-Criteria Search Strategy of Heuristic Learning Algorithm for Resource Constrained Project Scheduling Problems"International Journal of Industrial Engineering. (掲載予定). (2004)

    • Description
      「研究成果報告書概要(和文)」より
    • Related Report
      2003 Final Research Report Summary
  • [Publications] Ahsan M.K., De-bi Tsao: "A Heuristic Search Algorithm for Solving Resource-constrained Project Scheduling Problem"Asian-Pacific Journal of Operational Research. 20・2. 143-16 (2003)

    • Description
      「研究成果報告書概要(和文)」より
    • Related Report
      2003 Final Research Report Summary
  • [Publications] Ahsan M.K., De-bi Tsao: "A Comment on 'Solving Project Scheduling' Problems with a Heuristic Learning Algorithm"Journal of the Operations Research Society. 54・6. 666-668 (2003)

    • Description
      「研究成果報告書概要(和文)」より
    • Related Report
      2003 Final Research Report Summary
  • [Publications] 徳山博于, 曹徳弼, 熊本和浩: "生産マネジメント"朝倉書店. 230 (2002)

    • Description
      「研究成果報告書概要(和文)」より
    • Related Report
      2003 Final Research Report Summary
  • [Publications] Ahmad Rusdiansyah, De-bi Tsao: "An Integrated Model of the Periodic Delivery Problems for Vending-machine Supply Chains"Journal of Food Engineering. (Forthcoming). (2004)

    • Description
      「研究成果報告書概要(欧文)」より
    • Related Report
      2003 Final Research Report Summary
  • [Publications] De-bi Tsao, E.A.Silver: "A Dynamic Allocation Heuristic for Centralized Safety Stock"Naval Research Logistic. (Forthcoming). (2004)

    • Description
      「研究成果報告書概要(欧文)」より
    • Related Report
      2003 Final Research Report Summary
  • [Publications] Ahsan M.K., De-bi Tsao: "A Composite Multi-Criteria Search Strategy of Heuristic Learning Algorithm for Resource -Constrained Project Scheduling Problems"International Journal of Industrial Engineering. (Forthcoming). (2004)

    • Description
      「研究成果報告書概要(欧文)」より
    • Related Report
      2003 Final Research Report Summary
  • [Publications] De-bi Tsao, Ahsan M.K.: "A Composite Multi-criteria Search Technique for Resource-constrained Project Scheduling Problems"Journal of JIMA. Vol.54, No.5. 326-332 (2003)

    • Description
      「研究成果報告書概要(欧文)」より
    • Related Report
      2003 Final Research Report Summary
  • [Publications] Ahsan M.K., De-bi Tsao: "A Heuristic Search Algorithm for Solving Resource-constrained Project Scheduling Problem"Asian-Pacific Journal of Operational Research. Vol.20, No.2. 143-160 (2003)

    • Description
      「研究成果報告書概要(欧文)」より
    • Related Report
      2003 Final Research Report Summary
  • [Publications] Ahsan M.K., De-bi Tsao: "A comment on 'Solving Project Scheduling' Problems with a Heuristic Learning Algorithm"Journal of Operations Research Society. Vol.54, No.6. 666-668 (2003)

    • Description
      「研究成果報告書概要(欧文)」より
    • Related Report
      2003 Final Research Report Summary
  • [Publications] Ahsan M.K., De-bi Tsao: "Solving Resource-constrained Project Scheduling Problems by Bi-criteria Heuristic Search Techniques"Journal of System Science and System Engineering. Vol.12, No.2. 190-203 (2003)

    • Description
      「研究成果報告書概要(欧文)」より
    • Related Report
      2003 Final Research Report Summary
  • [Publications] Linyan Sun, Jian Wan, De-bi Tsao: "Research on the Influence and Philosophic Theory of Lean Production in Advanced Manufacturing"Journal of Aeronautical Manufacturing Technology. Vol.6, No.7. 31-35 (2003)

    • Description
      「研究成果報告書概要(欧文)」より
    • Related Report
      2003 Final Research Report Summary
  • [Publications] Linyan Sun, Jian Wang, De-bi Tsao: "Studies on the Classification of Advanced Manufacturing Modes"Journal of Mechanical Engineering. Vol.13, No.1. 84-88 (2002)

    • Description
      「研究成果報告書概要(欧文)」より
    • Related Report
      2003 Final Research Report Summary
  • [Publications] Ahmad Rusdiansyah, De-bi Tsao: "Routing and Scheduling for Delivery of Products under Vendor Managed Inventory Scheme"International Symposium on Scheduling 2004. 153-158 (2004)

    • Description
      「研究成果報告書概要(欧文)」より
    • Related Report
      2003 Final Research Report Summary
  • [Publications] De-bi Tsao, Sundong Min: "A Heuristic Analysis for Integrating Disassembly Planning and Scheduling"International Symposium on Scheduling 2004. 210-213 (2004)

    • Description
      「研究成果報告書概要(欧文)」より
    • Related Report
      2003 Final Research Report Summary
  • [Publications] Qunzhi Wang, De-bi Tsao: "Supply contract with options downward and upward"The 17^<th> International Conference on Production Research (ICPR). (2003)

    • Description
      「研究成果報告書概要(欧文)」より
    • Related Report
      2003 Final Research Report Summary
  • [Publications] Jian Wang, De-bi Tsao: "An Application of Multivariable Analysis on Strategic Management : A Case Study of Canonical Correlation Analysis in Strategic Fit"International Conference on Knowledge Management and Development of Science and Technology (KEST2003). 97-103 (2003)

    • Description
      「研究成果報告書概要(欧文)」より
    • Related Report
      2003 Final Research Report Summary
  • [Publications] Ahmad Rusdiansyah, De-bi Tsao: "A Study on Strategies for Online Content Providers"Proceeding of the 3^<rd> Asian e-Business Workshop. 231-242 (2003)

    • Description
      「研究成果報告書概要(欧文)」より
    • Related Report
      2003 Final Research Report Summary
  • [Publications] De-bi Tsao: "Evaluate Value of Downstream Information Sharing"Proceeding of International Conference on Global Supply Chain Management (ISGSCM). (2002)

    • Description
      「研究成果報告書概要(欧文)」より
    • Related Report
      2003 Final Research Report Summary
  • [Publications] Ahsan, M.Kamrul, De-bi Tsao: "Solving Resource-constrained Project Scheduling Problems by Intelligent Search Techniques"IFORS2002 Proceedings. (2002)

    • Description
      「研究成果報告書概要(欧文)」より
    • Related Report
      2003 Final Research Report Summary
  • [Publications] De-bi Tsao, T.Masui, R.Xia: "A new model of shortage estimation and prior sales allocation for seasonal item of apparel products"Informs annual meeting. (2002)

    • Description
      「研究成果報告書概要(欧文)」より
    • Related Report
      2003 Final Research Report Summary
  • [Publications] Jian Wang, Debi Tsao, Linyan Sun: "The Development and Implementation Process of Manufacturing Strategy In China : an Empirical Research"Proceedings of the 3^<rd> Asian-Pacific Conference on Industrial Engineering and Management System (APIEMS). (2002)

    • Description
      「研究成果報告書概要(欧文)」より
    • Related Report
      2003 Final Research Report Summary
  • [Publications] De-bi Tsao, E.A.Silver: "A Dynamic Allocation Heuristic for Centralized Safety Stock"Naval Research Logistic. 10月号(掲載予定). (2004)

    • Related Report
      2003 Annual Research Report
  • [Publications] Ahsan M.K., De-bi Tsao: "A Composite Multi-Criteria Search Strategy of Heuristic Learning Algorithm for Resource Constrained Project Scheduling Problems"International Journal of Industrial Engineering. 8月号(掲載予定). (2004)

    • Related Report
      2003 Annual Research Report
  • [Publications] 曹徳弼, Ahsan M.K: "複合評価基準に基づいた資源制約付きプロジェクトスケジューリング問題の解法に関する研究"日本経営工学会誌. 54・5. 326-332 (2003)

    • Related Report
      2003 Annual Research Report
  • [Publications] Ahsan M.K., De-bi Tsao: "A Heuristic Search Algorithm for Solving Resource-constrained Project Scheduling Problem"Asian-Pacific Journal of Operational Research. 20・2. 143-16 (2003)

    • Related Report
      2003 Annual Research Report
  • [Publications] Ahsan M.K., De-bi Tsao: "A Comment on 'Solving Project Scheduling' Problems with a Heuristic Learning Algorithm"Journal of the Operations Research Society. 54・6. 666-668 (2003)

    • Related Report
      2003 Annual Research Report
  • [Publications] 圓川隆夫: "外敵が物流を変える;9.11問題とトレーサビリティ"Material Flow. 44・1. (2003)

    • Related Report
      2003 Annual Research Report
  • [Publications] 藩家招, 曹徳弼: "現代生産管理"清華大学出版社. 400 (2003)

    • Related Report
      2003 Annual Research Report
  • [Publications] De-bi Tsao: "A new model of shortage estimation and prior Sales allocation for seasonal item of apparel products"Informs annual meeting. (予稿集). (2002)

    • Related Report
      2002 Annual Research Report
  • [Publications] 氷見聡明, 曹徳弼: "コスト関数を用いた2段階分枝型在庫システムに関する最適補充政策に関する研究"日本経営工学会2002年春季大会. (予稿集). 178-179 (2002)

    • Related Report
      2002 Annual Research Report
  • [Publications] 宮本周一, 曹徳弼: "タイムディスカウント実行における最適在庫水準と実行時期の決定方法"経営情報学会2002年春季全国研究発表大会. (予稿集). 130-233 (2002)

    • Related Report
      2002 Annual Research Report
  • [Publications] Ahsan, M.Kamrul, De-bi Tsao: "Solving Resource-constrained Project Scheduling Problems by Intelligent Search Techniques"IFORS 2002. (予稿集). 36-38 (2002)

    • Related Report
      2002 Annual Research Report
  • [Publications] Ahsan, M.Kamrul, De-bi Tsao: "A Heuristic Search Algorithm for Solving Resource-Constrained Project Scheduling Problem"Asia-Pacific Journal of Operations Research. 20*2. (2002)

    • Related Report
      2002 Annual Research Report
  • [Publications] De-bi Tsao (contributor): "Supply Chain Management in Japan"The Encyclopedia of Japanese Business and Management. book. 429-430 (2002)

    • Related Report
      2002 Annual Research Report
  • [Publications] 徳山博于, 曹徳弼, 熊本和浩: "生産マネジメント"朝倉書店. 200 (2002)

    • Related Report
      2002 Annual Research Report

URL: 

Published: 2002-04-01   Modified: 2016-04-21  

Information User Guide FAQ News Terms of Use Attribution of KAKENHI

Powered by NII kakenhi