Budget Amount *help |
¥41,210,000 (Direct Cost: ¥31,700,000、Indirect Cost: ¥9,510,000)
Fiscal Year 2019: ¥7,670,000 (Direct Cost: ¥5,900,000、Indirect Cost: ¥1,770,000)
Fiscal Year 2018: ¥8,710,000 (Direct Cost: ¥6,700,000、Indirect Cost: ¥2,010,000)
Fiscal Year 2017: ¥8,450,000 (Direct Cost: ¥6,500,000、Indirect Cost: ¥1,950,000)
Fiscal Year 2016: ¥8,060,000 (Direct Cost: ¥6,200,000、Indirect Cost: ¥1,860,000)
Fiscal Year 2015: ¥8,320,000 (Direct Cost: ¥6,400,000、Indirect Cost: ¥1,920,000)
|
Outline of Final Research Achievements |
The scientific prospect of the ILC (International Linear Collider) was updated as a Higgs factory machine running at 250 GeV CMS. International efforts for further technological upgrade of cost reduction are performed. Also, scientific evaluation by the expert committee of the MEXT is very high. Based on these facts, to search for the next paradigm of the particle physics beyond the Standard Model is the most eminent purpose of the ILC project. This would be obtained through detailed studies on the Higgs particle at 250 GeV with integrated luminosity of 2ab-1 was confirmed. We also assumed energy upgrade plan of the ILC and performed detailed simulation studies on the Higgs and the top quark, and obtained further profound results such as possibility to evaluate stability of the vacuum of this universe, etc.
|