Budget Amount *help |
¥34,320,000 (Direct Cost: ¥26,400,000、Indirect Cost: ¥7,920,000)
Fiscal Year 2018: ¥4,420,000 (Direct Cost: ¥3,400,000、Indirect Cost: ¥1,020,000)
Fiscal Year 2017: ¥8,450,000 (Direct Cost: ¥6,500,000、Indirect Cost: ¥1,950,000)
Fiscal Year 2016: ¥10,140,000 (Direct Cost: ¥7,800,000、Indirect Cost: ¥2,340,000)
Fiscal Year 2015: ¥11,310,000 (Direct Cost: ¥8,700,000、Indirect Cost: ¥2,610,000)
|
Outline of Final Research Achievements |
Structural integrity and quality assurance of welded components in ship-building process are developed considering with multi-physics analysis and high-precision measurement in this study. Numerical simulation of the thermal process treatments such as cutting, welding, and correcting are investigated with the scope of three fundamental elements; materials science, process physics, and thermal process mechanics.
|