Outline of Final Research Achievements |
With the project called "Industry 4.0" that gives the idea of the next generation production system, efforts utilizing ICT at the production scenes are underway rapidly. In particular, efforts to analyze large amounts of data extracted from various devices in the factory connected by a network are central to that. In this research project, we considered the quality management systems based on data analysis based on the manufacturing environment in which ICT was developed. Concretely, we examined a methodology for linking data analysis with the concept of cost and visualizing waste and losses into perceivable form by human beings.
|