Development of Multipurpose Production Schedule Improvement Cycle based on Batch Splitting and GA
Project/Area Number |
15K01216
|
Research Category |
Grant-in-Aid for Scientific Research (C)
|
Allocation Type | Multi-year Fund |
Section | 一般 |
Research Field |
Social systems engineering/Safety system
|
Research Institution | Osaka Institute of Technology |
Principal Investigator |
|
Project Period (FY) |
2015-04-01 – 2018-03-31
|
Project Status |
Completed (Fiscal Year 2017)
|
Budget Amount *help |
¥780,000 (Direct Cost: ¥600,000、Indirect Cost: ¥180,000)
Fiscal Year 2017: ¥390,000 (Direct Cost: ¥300,000、Indirect Cost: ¥90,000)
Fiscal Year 2016: ¥130,000 (Direct Cost: ¥100,000、Indirect Cost: ¥30,000)
Fiscal Year 2015: ¥260,000 (Direct Cost: ¥200,000、Indirect Cost: ¥60,000)
|
Keywords | ジョブショップスケジューリング / ロット分割 / メタヒューリスティクス |
Outline of Final Research Achievements |
Batch splitting is one of the effective methods to improve the performance of schedule. However, the number of batch is increasing according to iteration of splitting a batch. As a result, the number of total setups is increased but also the scheduling problem is made more complicated. Production Schedule Improvement Cycle which consists of four functions was developed in order to minimize the make-span and the total tardiness. The functions are selecting one batch to split, scheduling based on GA, improving setup times and confirming Gant chart. This cycle will be implemented repeatedly until an acceptable production schedule is acquired. The results of some numerical experiments show that the effectiveness of proposed cycle.
|