Budget Amount *help |
¥4,810,000 (Direct Cost: ¥3,700,000、Indirect Cost: ¥1,110,000)
Fiscal Year 2017: ¥1,040,000 (Direct Cost: ¥800,000、Indirect Cost: ¥240,000)
Fiscal Year 2016: ¥1,560,000 (Direct Cost: ¥1,200,000、Indirect Cost: ¥360,000)
Fiscal Year 2015: ¥2,210,000 (Direct Cost: ¥1,700,000、Indirect Cost: ¥510,000)
|
Outline of Final Research Achievements |
For strategic building operation and maintenance, it is important to grasp the conditions of the building in detail, and to analyze them one by one. However, conventional CAFM is insufficient. We developed a system (called Building Information Management System) to utilize BIM data made on a web site. In addition, we developed a mibile system to input a result of building inspections so as to reduce the burden of inputting information. A sensor network is used to acquire building operation and maintenance information to enhance building operation and maintenance. We also developed a system to automatically input sensing information into the building information for Building Information Management System, and to connect it with a 3D model. It has therefore become easier to collect the large amount of information necessary for strategic building operation and maintenance.
|