Budget Amount *help |
¥44,460,000 (Direct Cost: ¥34,200,000、Indirect Cost: ¥10,260,000)
Fiscal Year 2019: ¥9,490,000 (Direct Cost: ¥7,300,000、Indirect Cost: ¥2,190,000)
Fiscal Year 2018: ¥7,670,000 (Direct Cost: ¥5,900,000、Indirect Cost: ¥1,770,000)
Fiscal Year 2017: ¥12,740,000 (Direct Cost: ¥9,800,000、Indirect Cost: ¥2,940,000)
Fiscal Year 2016: ¥14,560,000 (Direct Cost: ¥11,200,000、Indirect Cost: ¥3,360,000)
|
Outline of Final Research Achievements |
We studied the controlled 1D, 2D, and 3D brickworks with various inorganic rectangular building nanoblocks covered by stabilizing organic agents. The structures of the ordered assembly are found to be controlled by changing several parameters, such as particle concentration and the properties of dispersion media and stabilizing agents. This brickwork technique is applicable for multicomponent systems using a library of rectangular nanoblocks. Homogeneous and heterogeneous ordered architectures with spatial and sequential control are selectively produced through the self-assembly of nanocubes and nanocuboids. These elaborate nanoscale brickworks are now being developed for the production of designed microstructures with novel functions.
|