• Search Research Projects
  • Search Researchers
  • How to Use
  1. Back to previous page

An interview-based analysis of schedulers of manufacturing companies to investigate their thinking pattern

Research Project

Project/Area Number 17510124
Research Category

Grant-in-Aid for Scientific Research (C)

Allocation TypeSingle-year Grants
Section一般
Research Field Social systems engineering/Safety system
Research InstitutionHIROSHIMA UNIVERSITY

Principal Investigator

MORIKAWA Katsumi  Hiroshima University, Graduate School of Engineering, Associate Professor, 大学院工学研究科, 助教授 (10200396)

Project Period (FY) 2005 – 2006
Project Status Completed (Fiscal Year 2006)
Budget Amount *help
¥1,400,000 (Direct Cost: ¥1,400,000)
Fiscal Year 2006: ¥900,000 (Direct Cost: ¥900,000)
Fiscal Year 2005: ¥500,000 (Direct Cost: ¥500,000)
KeywordsSystems Engineering / Scheduling / Manufacturing companies / Interview
Research Abstract

This study focuses on schedulers whose primal task is to decide the daily production plan. First we visited schedulers of ten manufacturing companies located in Chugoku region and asked the following questions; production planning system adopted, planning hierarchy and procedures, evaluation measure of schedule, degree of discrepancy between daily plans and their results, factors that cause changes, and requests to the academic research. The interview research revealed that the collaborative production planning had been adopted in many companies. The word collaborative means that schedulers made the production plan by using the production information system and also by talking with staffs of sales department and shop floor workers and foreman. Suggestions from the workers or foreman are often useful to improve the production plan. Detailed production schedule was often generated by foreman of the shop floor because such a decision needs a deep knowledge of process requirements and a full understanding of current shop floor conditions. The schedulers generally repeat the following three tasks several times; grasp the current condition, make or revise the plan, and evaluate the plan. Typical information needed is combined with the above iterative actions, and considered as a basic thinking pattern of the schedulers. The interview research also revealed that the importance of the schedulers was not evaluated correctly. Under a hypothetical manufacturing environment, a simulation model of the schedulers was proposed based on system dynamics. The simulation results demonstrated the importance of the collaborative planning activities of the schedulers quantitatively.

Report

(3 results)
  • 2006 Annual Research Report   Final Research Report Summary
  • 2005 Annual Research Report
  • Research Products

    (9 results)

All 2006 2005

All Journal Article (9 results)

  • [Journal Article] インタビュー調査に基づく製造企業の生産管理の現状と課題2006

    • Author(s)
      森川 克己
    • Journal Title

      日本経営工学会平成18年度春季大会予稿集

      Pages: 158-159

    • Description
      「研究成果報告書概要(和文)」より
    • Related Report
      2006 Annual Research Report 2006 Final Research Report Summary
  • [Journal Article] 製造企業における協働的生産計画に関するシミュレーション研究2006

    • Author(s)
      森川 克己
    • Journal Title

      日本経営工学会平成18年度秋季研究大会予稿集

      Pages: 280-281

    • Description
      「研究成果報告書概要(和文)」より
    • Related Report
      2006 Final Research Report Summary
  • [Journal Article] Modeling planning and scheduling tasks based on interviews2006

    • Author(s)
      Katsumi Morikawa
    • Journal Title

      Proceedings of the Seventh Asia-Pacific Industrial Engineering and Management Systems Conference

      Pages: 1657-1661

    • Description
      「研究成果報告書概要(和文)」より
    • Related Report
      2006 Annual Research Report 2006 Final Research Report Summary
  • [Journal Article] Current state and issues of the production management of manufacturing companies via interview (in Japanese)2006

    • Author(s)
      Katsumi Morikawa
    • Journal Title

      Proceedings of Annual Spring Meeting of Japan Industrial Management Association

      Pages: 158-159

    • Description
      「研究成果報告書概要(欧文)」より
    • Related Report
      2006 Final Research Report Summary
  • [Journal Article] A simulation study on collaborative production planning in manufacturing companies (in Japanese)2006

    • Author(s)
      Katsumi Morikawa
    • Journal Title

      Proceedings of Annual Autumn Meeting of Japan Industrial Management Association

      Pages: 280-281

    • Description
      「研究成果報告書概要(欧文)」より
    • Related Report
      2006 Final Research Report Summary
  • [Journal Article] Modeling planning and scheduling tasks based on interview2006

    • Author(s)
      Katsumi Morikawa
    • Journal Title

      Proceedings of the Seventh Asia-Pacific Industrial Engineering and Management Systems Conference

      Pages: 1657-1661

    • Description
      「研究成果報告書概要(欧文)」より
    • Related Report
      2006 Final Research Report Summary
  • [Journal Article] 製造企業における協働的生産計画に関するシミュレーション研究2006

    • Author(s)
      森川 克己
    • Journal Title

      日本経営工学会平成18年度秋季大会予稿集

      Pages: 280-281

    • Related Report
      2006 Annual Research Report
  • [Journal Article] 製造企業におけるスケジューリングの理論と実際2005

    • Author(s)
      森川 克己
    • Journal Title

      日本経営工学会平成17年度秋季研究大会予稿集

      Pages: 18-19

    • Description
      「研究成果報告書概要(和文)」より
    • Related Report
      2006 Final Research Report Summary 2005 Annual Research Report
  • [Journal Article] Theory and practice of scheduling in manufacturing companies (in Japanese)2005

    • Author(s)
      Katsumi Morikawa
    • Journal Title

      Proceedings of Annual Autumn Meeting of Japan Industrial Management Association

      Pages: 18-19

    • Description
      「研究成果報告書概要(欧文)」より
    • Related Report
      2006 Final Research Report Summary

URL: 

Published: 2005-04-01   Modified: 2016-04-21  

Information User Guide FAQ News Terms of Use Attribution of KAKENHI

Powered by NII kakenhi