Proposal on Design of Vertical Pre-Reinforced Bolt Method

Research Project

Project/Area Number 17560447
Research Category

Grant-in-Aid for Scientific Research (C)

Allocation TypeSingle-year Grants
Section一般
Research Field Geotechnical engineering
Research InstitutionTokyo Metropolitan University

Principal Investigator

NISHIMURA Kazuo  Tokyo Metropolitan University, Graduate Schools of Urban Environmental Sciences, Professor, 大学院都市環境科学研究科, 教授 (70128578)

Co-Investigator(Kenkyū-buntansha) DOMON Tsuyoshi  Tokyo Metropolitan University, Graduate Schools of Urban Environmental Sciences, Research Assistant, 大学院都市環境科学研究科, 助手 (50237179)
Project Period (FY) 2005 – 2006
Project Status Completed (Fiscal Year 2006)
Budget Amount *help
¥3,300,000 (Direct Cost: ¥3,300,000)
Fiscal Year 2006: ¥1,300,000 (Direct Cost: ¥1,300,000)
Fiscal Year 2005: ¥2,000,000 (Direct Cost: ¥2,000,000)
KeywordsTunnel / Vertical Pre-Reinforced Bolt Method / Subsidence / Model Test / Auxiliary Method / 垂直縫地工法 / 低土被りトンネル / 都市NATM / DEM解析
Research Abstract

During tunnel excavation in the area of the entrance of mountain tunnel or shallow tunnel, such many problems as subsidence of the ground surface and collapse of the cutting face of the tunnel or the land slide of the slope above the tunnel sometimes occur. The auxiliary method of coping with such problems, called "Vertical Pre-Reinforced Bolt Method," is adapted to keep the natural surroundings. However, the design of vertical pre-reinforced method based on the experience in respect of the equivalence force between ground movement and rock bolt. It is not a method for sufficiently evaluating the stiffening effect to protect a ground settlement and a land slide. In addition, there is still few data clarifying the effectiveness of this method from field measurements.
This study was planned to verify the effectiveness of penetration depth of reinforce members below the bottom section level of the tunnel using model tests with the aim of reducing the width of site area and construction cost. The proposal of the suggested method on the design and construction of vertical pre-reinforced bolt method was pursued.
As the result, the vertical pre-reinforced bolt behaved an axis reinforcement model to assist the ground arch of the ground by tunnel excavation. The load of tunnel excavation is effectively distributed in the front and side of the tunnel face by its reinforcement. This research is completed.

Report

(3 results)
  • 2006 Annual Research Report   Final Research Report Summary
  • 2005 Annual Research Report
  • Research Products

    (3 results)

All 2006 2005

All Journal Article (3 results)

  • [Journal Article] トンネル掘削に伴う地山挙動の予測手法に関する研究2006

    • Author(s)
      藤原多聞
    • Journal Title

      土木学会第61回年次学術講演会講演概要集 Vol.61-3(CD-ROM)

      Pages: 66-66

    • Description
      「研究成果報告書概要(和文)」より
    • Related Report
      2006 Annual Research Report 2006 Final Research Report Summary
  • [Journal Article] Study on prediction method of ground movement during tunnel excavation2006

    • Author(s)
      FUJIWARA Tamon
    • Journal Title

      The Proc. of the 60^<th>th JSCE Annual Meeting III-066(CD-ROM)

    • Description
      「研究成果報告書概要(欧文)」より
    • Related Report
      2006 Final Research Report Summary
  • [Journal Article] 垂直縫地ボルトの補強効果2005

    • Author(s)
      高橋 能久, 西村 和夫, 土門 剛
    • Journal Title

      土木学会第60回年次学術講演会講演概要集 Vol.60-III(CD-ROM)

      Pages: 221-221

    • Related Report
      2005 Annual Research Report

URL: 

Published: 2005-04-01   Modified: 2016-04-21  

Information User Guide FAQ News Terms of Use Attribution of KAKENHI

Powered by NII kakenhi