Budget Amount *help |
¥44,200,000 (Direct Cost: ¥34,000,000、Indirect Cost: ¥10,200,000)
Fiscal Year 2019: ¥13,390,000 (Direct Cost: ¥10,300,000、Indirect Cost: ¥3,090,000)
Fiscal Year 2018: ¥14,040,000 (Direct Cost: ¥10,800,000、Indirect Cost: ¥3,240,000)
Fiscal Year 2017: ¥16,770,000 (Direct Cost: ¥12,900,000、Indirect Cost: ¥3,870,000)
|
Outline of Final Research Achievements |
The unique physical properties are expected to exhibit by the geometrical structures existing in the dimensional crossing region, which has been predicted for a long time, mainly by physical property theorists. In this study, by using a rational construction method using coordination chemistry, various geometrical structures existing in the dimensional intersection region are synthesized, further material development is advanced, and novel physical properties hidden in the dimensional intersection region were promoted.
|