Budget Amount *help |
¥4,550,000 (Direct Cost: ¥3,500,000、Indirect Cost: ¥1,050,000)
Fiscal Year 2019: ¥1,560,000 (Direct Cost: ¥1,200,000、Indirect Cost: ¥360,000)
Fiscal Year 2018: ¥260,000 (Direct Cost: ¥200,000、Indirect Cost: ¥60,000)
Fiscal Year 2017: ¥2,730,000 (Direct Cost: ¥2,100,000、Indirect Cost: ¥630,000)
|
Outline of Final Research Achievements |
Mud pulse telemetry is widely used in "measurement while drilling (MWD)" systems to transmit signal from the bottom hole to the ground. In this study, we propose a signal processing method, which is based on time series modeling and the maximum likelihood principle, to enhance the transmission capacity via the multiple modulators. We show using a simulation that our method outperform the conventional correlation-based method in the transmission capacity.
|