Budget Amount *help |
¥4,680,000 (Direct Cost: ¥3,600,000、Indirect Cost: ¥1,080,000)
Fiscal Year 2019: ¥650,000 (Direct Cost: ¥500,000、Indirect Cost: ¥150,000)
Fiscal Year 2018: ¥1,950,000 (Direct Cost: ¥1,500,000、Indirect Cost: ¥450,000)
Fiscal Year 2017: ¥2,080,000 (Direct Cost: ¥1,600,000、Indirect Cost: ¥480,000)
|
Outline of Final Research Achievements |
Multi-stage physical network recovery is required after large-scale network failures during unprecedented disasters. We here tackled methods to determine effective recovery order of damaged network components. First, we proposed a network recovery method considering two recovery-stages for the connectivity and the traffic demands so as to meet recovery requirements that change with time lapse. Second, we proposed a network abstraction algorithm to reduce the number of network elements considered in computing a recovery order, where network area without failures is abstracted. Finally, we realized a network recovery simulator and confirm basic series of operation from network failure to network recovery for an outcome of our proposed methods.
|