A Study of Probabilistic Risk Evaluation for Software Requirements based on Bayesian Network

Research Project

Project/Area Number 17K00354
Research Category

Grant-in-Aid for Scientific Research (C)

Allocation TypeMulti-year Fund
Section一般
Research Field Soft computing
Research InstitutionUniversity of Marketing and Distribution Sciences

Principal Investigator

MOCHIDA Shinji  流通科学大学, 商学部, 教授 (40412374)

Co-Investigator(Kenkyū-buntansha) 磯貝 恭史  流通科学大学, 商学部, 教授 (00109860)
満行 泰河  横浜国立大学, 大学院工学研究院, 准教授 (40741335)
稗方 和夫  東京大学, 大学院新領域創成科学研究科, 准教授 (80396770)
Project Period (FY) 2017-04-01 – 2020-03-31
Project Status Completed (Fiscal Year 2019)
Budget Amount *help
¥4,420,000 (Direct Cost: ¥3,400,000、Indirect Cost: ¥1,020,000)
Fiscal Year 2019: ¥1,300,000 (Direct Cost: ¥1,000,000、Indirect Cost: ¥300,000)
Fiscal Year 2018: ¥2,080,000 (Direct Cost: ¥1,600,000、Indirect Cost: ¥480,000)
Fiscal Year 2017: ¥1,040,000 (Direct Cost: ¥800,000、Indirect Cost: ¥240,000)
Keywordsベイジアンネットワーク / システム開発プロジェクト / プロジェクトマネジメント / ベイジアン推定 / 要求書分析 / プロジェクト / リスク / リスク評価 / 確率的 / インフルーエンスダイアグラム / システム開発 / 見積もり / ソフトウエア要求仕様 / 確率的リスク評価
Outline of Final Research Achievements

This research aim to get an evaluation method for evaluating system development risk. In general, project costs are calculated based on development man-hours and difficulty. Then costs are not calculated based on requirements. Therefore, the calculated costs doesn’t meet value that a customer expected. Specification changes will cause delays and cost overruns. Then this study tried to build an evaluating system with a probabilistic method and linguistic specification analysis for specification of each requirement. As a result, it was cleared a contingency of 10% to 20% of total cost is needed in project usually. In addition, the probabilistic model showed that system development risk depends on the accuracy of required specifications.

Academic Significance and Societal Importance of the Research Achievements

通常、プロジェクトの予算には、不確実要因に起因するリスク対応予備費として、当初費用の10%から20%の費用を確保する。しかしこの予備費の割合に科学的根拠を考える研究はこれまでにない。そこで本研究はプロジェクト中の不確実要因をプロジェクトマネージャーとプログラマーのスキル、そして見積もりと要求仕様の精度と考え、次にプロジェクト中の不可実要因を確率的モデルで表現して、要因の信頼度とリスクの関係を求めた。その結果、プロジェクト費用に加算される10%から20%の予備費に仕様分析に基づいた科学的根拠を与えた、更に本研究はプロジェクトリスクが要求仕様に左右されることを科学的に示した。

Report

(4 results)
  • 2019 Annual Research Report   Final Research Report ( PDF )
  • 2018 Research-status Report
  • 2017 Research-status Report
  • Research Products

    (19 results)

All 2020 2019 2018 2017 Other

All Journal Article (7 results) (of which Int'l Joint Research: 2 results,  Peer Reviewed: 3 results,  Open Access: 6 results) Presentation (8 results) (of which Int'l Joint Research: 6 results,  Invited: 1 results) Remarks (4 results)

  • [Journal Article] システム開発プロジェクトリスクの確率的評価に関する研究2020

    • Author(s)
      持田 信治
    • Journal Title

      バイオメディカル・ファジィ・システム学会誌 Vol22

      Volume: 22

    • NAID

      130007998351

    • Related Report
      2019 Annual Research Report
    • Peer Reviewed / Open Access
  • [Journal Article] A Study of probabilistic risk Evaluation for System Development Project Based on Requirements Analysis and Bayesian estimation2019

    • Author(s)
      Shinji Mochida
    • Journal Title

      International Journal of BMFSA Vol24

      Volume: 24 Pages: 19-27

    • NAID

      40022083879

    • Related Report
      2019 Annual Research Report
    • Peer Reviewed / Open Access
  • [Journal Article] システム開発における確率的リスク評価方法2019

    • Author(s)
      持田 信治
    • Journal Title

      第62回 日本経営システム学会全国大会講演論文集

      Volume: - Pages: 61-62

    • Related Report
      2019 Annual Research Report
    • Open Access
  • [Journal Article] Study of probabilistic risk Evaluation for System Development Project Based on Requirements Analysis and Bayesian Estimation2019

    • Author(s)
      Shinji Mochida
    • Journal Title

      26th ISTE International Conference on Transdisciplinary Engineering proceeding

      Volume: -

    • NAID

      40022083879

    • Related Report
      2019 Annual Research Report
    • Open Access
  • [Journal Article] Proposal of probability risk Evaluation for System Development Project Based on Requirements Analysis and Bayesian estimation2019

    • Author(s)
      Shinji Mochida
    • Journal Title

      22nd Czech-Japan Seminar on Data Analysis and Decision Making proceeding

      Volume: - Pages: 108-114

    • Related Report
      2019 Annual Research Report
  • [Journal Article] Research on Probabilistic Risk Evaluation of Business System Development Project Based on Requirements Analysis2017

    • Author(s)
      Shinji Mochida
    • Journal Title

      35th International Conference on Mathematical Methods in Economics Conference Proceedings Czech Software First, Ltd

      Volume: 1 Pages: 485-479

    • Related Report
      2017 Research-status Report
    • Peer Reviewed / Open Access / Int'l Joint Research
  • [Journal Article] Proposal of Probabilistic risk Evaluation for System Development Project Based on Requirements Analysis2017

    • Author(s)
      Shinji Mochida
    • Journal Title

      Proceedings of the 20th Czech-Japan Seminar on Data Analysis and Decision Making under Uncertainty University of Ostrava, Dvorakova

      Volume: 1 Pages: 99-108

    • Related Report
      2017 Research-status Report
    • Open Access / Int'l Joint Research
  • [Presentation] Study of probabilistic risk Evaluation for System Development Project Based on Requirements Analysis and Bayesian Estimation2019

    • Author(s)
      Shinji Mochida
    • Organizer
      26th ISTE International Conference on Transdisciplinary Engineering
    • Related Report
      2019 Annual Research Report
    • Int'l Joint Research
  • [Presentation] システム開発における確率的リスク評価方法2019

    • Author(s)
      持田 信治
    • Organizer
      第62回 日本経営システム学会全国大会
    • Related Report
      2019 Annual Research Report
  • [Presentation] 22nd Czech-Japan Seminar on Data Analysis and Decision Making proceeding2019

    • Author(s)
      Shinji Mochida
    • Organizer
      Proposal of probability risk Evaluation for System Development Project Based on Requirements Analysis and Bayesian estimation
    • Related Report
      2019 Annual Research Report
    • Int'l Joint Research
  • [Presentation] System Dynamics Modeling for Change Management Strategy of Software Project2019

    • Author(s)
      Kazuo Hiekata, Mst. Taskia Khatun, Marc-Andre Chavy-Macdonal
    • Organizer
      人工知能学会 第37回知識・技術・技能の伝承支援研究会
    • Related Report
      2019 Annual Research Report
  • [Presentation] Proposal of probability risk Evaluation for System Development Project Based on requirements Analysis and Bayesian estimation2018

    • Author(s)
      Shinji Mochida
    • Organizer
      he 11th Workshop on Uncertainty Processing in Czech
    • Related Report
      2018 Research-status Report
    • Int'l Joint Research
  • [Presentation] Proposal of probability risk Evaluation for System Development Project Based on requirements Analysis and Bayesian estimation2018

    • Author(s)
      Shinji Mochida
    • Organizer
      The 21st CZECH-JAPAN SEMINAR on Data Analysis and Decision Making
    • Related Report
      2018 Research-status Report
    • Int'l Joint Research
  • [Presentation] Research on Probabilistic Risk Evaluation of Business System Development Project Based on Requirements Analysis2017

    • Author(s)
      Shinji Mochida
    • Organizer
      35th International Conference on Mathematical Methods in Economics
    • Related Report
      2017 Research-status Report
    • Int'l Joint Research / Invited
  • [Presentation] Proposal of Probabilistic risk Evaluation for System Development Project Based on Requirements Analysis2017

    • Author(s)
      Shinji Mochida
    • Organizer
      20th Czech-Japan Seminar on Data Analysis and Decision Making under Uncertainty
    • Related Report
      2017 Research-status Report
    • Int'l Joint Research
  • [Remarks] 流通科学大学 研究者情報

    • URL

      https://www.umds.ac.jp/academics/profile/index_ma/mochida/

    • Related Report
      2019 Annual Research Report
  • [Remarks] he 11th Workshop on Uncertainty Processing

    • URL

      http://wupes.utia.cas.cz/

    • Related Report
      2018 Research-status Report
  • [Remarks] MME 2017

    • URL

      http://fim2.uhk.cz/mme/

    • Related Report
      2017 Research-status Report
  • [Remarks] 20th Czech-Japan2017

    • URL

      http://irafm.osu.cz/cjs2017/programme.html

    • Related Report
      2017 Research-status Report

URL: 

Published: 2017-04-28   Modified: 2021-02-19  

Information User Guide FAQ News Terms of Use Attribution of KAKENHI

Powered by NII kakenhi