Outline of Final Research Achievements |
The purpose of this study is to analyze the trade-off structure between reducing the evacuation risk of local residents by the initial fire extinguishing activities of the fire extinguishing team engaged in fire extinguishing activities against earthquake fires and increasing the evacuation risk due to the evacuation delay of the fire extinguishing team. And to clarify the time limit for starting evacuation. As a result of analysis targeting evacuation areas where there is a high risk of fire spread in Tokyo, it became clear that even if the fire extinguishing team carried out alert and fire extinguishing activities until late, there was a limit to reducing the evacuation risk of local residents, and the evacuation risk for the fire extinguishing team increased sharply with a high fire density case.
|