Budget Amount *help |
¥4,420,000 (Direct Cost: ¥3,400,000、Indirect Cost: ¥1,020,000)
Fiscal Year 2020: ¥1,430,000 (Direct Cost: ¥1,100,000、Indirect Cost: ¥330,000)
Fiscal Year 2019: ¥1,560,000 (Direct Cost: ¥1,200,000、Indirect Cost: ¥360,000)
Fiscal Year 2018: ¥1,430,000 (Direct Cost: ¥1,100,000、Indirect Cost: ¥330,000)
|
Outline of Final Research Achievements |
At the lighting poles, the corrosion of the foundation which occurs mainly close to the ground becomes the problem. In this study, Mortar Filled Double Steel Tubular members was focused on as a new update method of implanted basic lighting poles and examined the applicability of connection structure. Experiments of three-point bending tests showed the range which can function surely as composite structure when it has implantation length above a certain level. Moreover, FEM analysis was conducted to examine influence of implantation length, and as a result, the difference of bending load bearing mechanism of this structure became clear.
|