Budget Amount *help |
¥3,640,000 (Direct Cost: ¥2,800,000、Indirect Cost: ¥840,000)
Fiscal Year 2020: ¥1,170,000 (Direct Cost: ¥900,000、Indirect Cost: ¥270,000)
Fiscal Year 2019: ¥1,170,000 (Direct Cost: ¥900,000、Indirect Cost: ¥270,000)
Fiscal Year 2018: ¥1,300,000 (Direct Cost: ¥1,000,000、Indirect Cost: ¥300,000)
|
Outline of Final Research Achievements |
This research project aims at developing fundamental technologies for next-generation urban infrastructure systems. This project has developed a new dynamic incentive mechanism merging contract theory, optimal control theory and game theory to lead the individually optimal state into a global optimizer. Moreover, the proposed mechanism is applied to the optimal design for the strategic bidding problem of the agents' private model information under moral hazard. The effectiveness of the proposed mechanism is also demonstrated via simulations on dynamic power networks and traffic systems.
|