Budget Amount *help |
¥434,590,000 (Direct Cost: ¥334,300,000、Indirect Cost: ¥100,290,000)
Fiscal Year 2011: ¥25,220,000 (Direct Cost: ¥19,400,000、Indirect Cost: ¥5,820,000)
Fiscal Year 2010: ¥109,850,000 (Direct Cost: ¥84,500,000、Indirect Cost: ¥25,350,000)
Fiscal Year 2009: ¥117,910,000 (Direct Cost: ¥90,700,000、Indirect Cost: ¥27,210,000)
Fiscal Year 2008: ¥112,970,000 (Direct Cost: ¥86,900,000、Indirect Cost: ¥26,070,000)
Fiscal Year 2007: ¥68,640,000 (Direct Cost: ¥52,800,000、Indirect Cost: ¥15,840,000)
|
Research Abstract |
We have not achieved our aims in this project because of immeasurable damage suffered from the East Japan Earthquake that took place at the end of FY2010. This is a progress report on the project up to date. We constructed a large detector system, FOREST, and developed a novel target system and a fast data-acquisition system to reach our goals. We obtained so far an excellent data set with a fine energy step in the threshold region of . photoproduction as well as the basic data for single . production. A next generation 4. EM calorimeter, BGOegg, was completed, moved to SPring-8, and started operation.
|