Budget Amount *help |
¥13,260,000 (Direct Cost: ¥10,200,000、Indirect Cost: ¥3,060,000)
Fiscal Year 2009: ¥3,770,000 (Direct Cost: ¥2,900,000、Indirect Cost: ¥870,000)
Fiscal Year 2008: ¥4,680,000 (Direct Cost: ¥3,600,000、Indirect Cost: ¥1,080,000)
Fiscal Year 2007: ¥4,810,000 (Direct Cost: ¥3,700,000、Indirect Cost: ¥1,110,000)
|
Research Abstract |
For scheduling problems of shipbuilding lines with conveyers and stockyards, the research proposed a just-in-time scheduling methodology using linear system representations based on Max-Plus algebra. Specifically, in the case of two-pairs-tandem production, it was shown that a block assembly line under the consideration of the input order of blocks and the number limitation of stocked blocks could be scheduled effectively.
|