Advanced production and distribution method considering total optimization under the JIT supply process environment
Project/Area Number |
19510144
|
Research Category |
Grant-in-Aid for Scientific Research (C)
|
Allocation Type | Single-year Grants |
Section | 一般 |
Research Field |
Social systems engineering/Safety system
|
Research Institution | Kanazawa University |
Principal Investigator |
YOO Jaekyu Kanazawa University, 経済学経営学系, 教授 (20324494)
|
Co-Investigator(Kenkyū-buntansha) |
SHIMIZU Yoshiaki 豊橋技術科学大学, 工学部, 教授 (10109085)
|
Project Period (FY) |
2007 – 2009
|
Project Status |
Completed (Fiscal Year 2009)
|
Budget Amount *help |
¥4,420,000 (Direct Cost: ¥3,400,000、Indirect Cost: ¥1,020,000)
Fiscal Year 2009: ¥1,300,000 (Direct Cost: ¥1,000,000、Indirect Cost: ¥300,000)
Fiscal Year 2008: ¥1,430,000 (Direct Cost: ¥1,100,000、Indirect Cost: ¥330,000)
Fiscal Year 2007: ¥1,690,000 (Direct Cost: ¥1,300,000、Indirect Cost: ¥390,000)
|
Keywords | 経営工学 / システム工学 / 生産管理 / 多目的最適化手法 / TOCスケジューリング手法 / スケジューリング手法 |
Research Abstract |
We developed an advanced manufacturing system called Pull-Push type production method. It is possible in promoting the process efficiency while keeping production flexibility. Moreover, we tried to apply the proposed method to a distribution system of the supply chain. After all, we clarified that the proposed method is superior to JIT production for changes in production environment.
|
Report
(4 results)
Research Products
(18 results)