• Search Research Projects
  • Search Researchers
  • How to Use
  1. Back to previous page

Collaborative and hierarchical scheduling in the manufacturing industry

Research Project

Project/Area Number 19510149
Research Category

Grant-in-Aid for Scientific Research (C)

Allocation TypeSingle-year Grants
Section一般
Research Field Social systems engineering/Safety system
Research InstitutionHiroshima University

Principal Investigator

MORIKAWA Katsumi  Hiroshima University, 大学院・工学研究科, 准教授 (10200396)

Project Period (FY) 2007 – 2009
Project Status Completed (Fiscal Year 2009)
Budget Amount *help
¥2,730,000 (Direct Cost: ¥2,100,000、Indirect Cost: ¥630,000)
Fiscal Year 2009: ¥780,000 (Direct Cost: ¥600,000、Indirect Cost: ¥180,000)
Fiscal Year 2008: ¥780,000 (Direct Cost: ¥600,000、Indirect Cost: ¥180,000)
Fiscal Year 2007: ¥1,170,000 (Direct Cost: ¥900,000、Indirect Cost: ¥270,000)
Keywords生産管理 / 生産計画 / スケジューリング / 階層的問題 / 人間 / ヒューリスティック / 最適化 / 協働的 / 階層性 / 人間の役割
Research Abstract

This study proposes new solution procedures for three different production environments. For the hierarchical production planning and schedule coordination, several models are developed. In a two-stage production system, the planning flow from the downstream stage to the upstream stage is assumed, and hierarchical planning models and collaborative coordination mechanisms between stages are proposed. In addition, assigning an expert planner in each stage is shown to be favorable under the assumed conditions. The role of human schedulers are also modeled and evaluated via system dynamics. Finally the planning, scheduling and rescheduling models under hierarchical skill levels of workers are developed.

Report

(4 results)
  • 2009 Annual Research Report   Final Research Report ( PDF )
  • 2008 Annual Research Report
  • 2007 Annual Research Report
  • Research Products

    (17 results)

All 2010 2009 2008 2007 Other

All Journal Article (5 results) (of which Peer Reviewed: 5 results) Presentation (11 results) Remarks (1 results)

  • [Journal Article] A flexible branch and bound method for the job shop scheduling problem2009

    • Author(s)
      Katsumi Morikawa, Katsuhiko Takahashi
    • Journal Title

      Industrial Engineering & Management Systems Vol.8,No.4

      Pages: 239-246

    • Related Report
      2009 Final Research Report
    • Peer Reviewed
  • [Journal Article] Reentrant line scheduling using weighted fair queuin2009

    • Author(s)
      Katsumi Morikawa, Katsuhiko Takahashi, Daisuke Hirotani, Takayuki Kataoka
    • Journal Title

      日本経営工学会論文誌 Vol.60,No.3E

      Pages: 183-190

    • Related Report
      2009 Final Research Report
    • Peer Reviewed
  • [Journal Article] A flexible branch and bound method for the job shop scheduling problem2009

    • Author(s)
      Katsumi Morikawa
    • Journal Title

      Industrial Engineering & Management Systems Vol.8, No.4

      Pages: 239-246

    • Related Report
      2009 Annual Research Report
    • Peer Reviewed
  • [Journal Article] Reentrant line scheduling using weighted fair queuing2009

    • Author(s)
      Katsumi Morikawa
    • Journal Title

      日本経営工学会論文誌 Vol.60, No.3E

      Pages: 183-190

    • NAID

      110007605340

    • Related Report
      2009 Annual Research Report
    • Peer Reviewed
  • [Journal Article] Reentrant line scheduling using weighted fair queuing2009

    • Author(s)
      Katsumi Morikawa
    • Journal Title

      日本経営工学会論文誌 60・3E (掲載決定)

    • NAID

      110007605340

    • Related Report
      2008 Annual Research Report
    • Peer Reviewed
  • [Presentation] 作業者の技能の階層性を考慮した生産スケジューリングと再スケジューリング2010

    • Author(s)
      森川克己, 高橋勝彦, 広谷大助
    • Organizer
      日本経営工学会平成22年度春季大会
    • Place of Presentation
      東京都千代田区
    • Year and Date
      2010-05-15
    • Related Report
      2009 Final Research Report
  • [Presentation] 2工程生産システムの生産計画における局所最適化と全体最適化2010

    • Author(s)
      森川克己, 高橋勝彦
    • Organizer
      日本機械学会生産システム部門研究発表講演会2010
    • Place of Presentation
      東京都新宿区
    • Year and Date
      2010-03-15
    • Related Report
      2009 Annual Research Report 2009 Final Research Report
  • [Presentation] Daisuke Hirotani, Production planning and scheduling for multi-site manufacturing by considering hierarchical workforce2009

    • Author(s)
      Antrawan Junaputra, Katsumi Morikawa, Katsuhiko Takahashi
    • Organizer
      The 20th National Conference of Australian Society for Operations Research
    • Place of Presentation
      ゴールドコースト, オーストラリア
    • Year and Date
      2009-09-28
    • Related Report
      2009 Final Research Report
  • [Presentation] Production planning and scheduling for multi-site manufacturing by considering hierarchical workforce2009

    • Author(s)
      Antrawan Junaputra
    • Organizer
      The 20^<th> National Conference of Australian Society for Operations Research
    • Place of Presentation
      ゴールドコースト、オーストラリア
    • Year and Date
      2009-09-28
    • Related Report
      2009 Annual Research Report
  • [Presentation] A flexible branch and bound method for the job shop scheduling problem2008

    • Author(s)
      Katsumi Morikawa, Katsuhiko Takahashi
    • Organizer
      The 9th Asia-Pacific Industrial Engineering & Management System Conference
    • Place of Presentation
      バリ, インドネシア
    • Year and Date
      2008-12-05
    • Related Report
      2009 Final Research Report
  • [Presentation] A flexible branch and bound method for the job shop scheduling problem2008

    • Author(s)
      Katsumi Morikawa
    • Organizer
      The 9^<th> Asia Pacific Industrial Engineering & Management Systems Conference
    • Place of Presentation
      バリ、インドネシア
    • Year and Date
      2008-12-05
    • Related Report
      2008 Annual Research Report
  • [Presentation] Collaborative production planning for a two-stage production system2008

    • Author(s)
      Katsumi Morikawa, Katsuhiko Takahashi
    • Organizer
      The 15th International Symposium on Inventories
    • Place of Presentation
      ブダペスト, ハンガリー
    • Year and Date
      2008-08-23
    • Related Report
      2009 Final Research Report
  • [Presentation] Collaborative production planning for a two-stage production system2008

    • Author(s)
      Katsumi Moriikawa
    • Organizer
      15^<th> International Symposium on Inventories
    • Place of Presentation
      ブダペスト、ハンガリー
    • Year and Date
      2008-08-23
    • Related Report
      2008 Annual Research Report
  • [Presentation] 確定的環境における2工程生産システムの生産計画に関する研究2007

    • Author(s)
      森川克己, 高橋勝彦
    • Organizer
      日本経営工学会平成19年度秋季研究大会
    • Place of Presentation
      北海道小樽市
    • Year and Date
      2007-10-21
    • Related Report
      2009 Final Research Report 2007 Annual Research Report
  • [Presentation] Analysis of the human role in planning and scheduling via system dynamics2007

    • Author(s)
      Katsumi Morikawa, Katsuhiko Takahashi
    • Organizer
      The International IFIP TC5, WG 5. 7 Conference on Advances in Production Management Systems
    • Place of Presentation
      リンシェーピング, スウェーデン
    • Year and Date
      2007-09-18
    • Related Report
      2009 Final Research Report
  • [Presentation] Analysis of the human role in planning and scheduling via system dynamics2007

    • Author(s)
      Katsumi Morikawa
    • Organizer
      International Conference on Advances in Production Management Systems
    • Place of Presentation
      リンシェーピング、スウェーデン
    • Year and Date
      2007-09-18
    • Related Report
      2007 Annual Research Report
  • [Remarks]

    • URL

      http://www.pse.hiroshima-u.ac.jp/

    • Related Report
      2009 Final Research Report

URL: 

Published: 2007-04-01   Modified: 2016-04-21  

Information User Guide FAQ News Terms of Use Attribution of KAKENHI

Powered by NII kakenhi