Budget Amount *help |
¥25,090,000 (Direct Cost: ¥19,300,000、Indirect Cost: ¥5,790,000)
Fiscal Year 2010: ¥5,720,000 (Direct Cost: ¥4,400,000、Indirect Cost: ¥1,320,000)
Fiscal Year 2009: ¥5,720,000 (Direct Cost: ¥4,400,000、Indirect Cost: ¥1,320,000)
Fiscal Year 2008: ¥6,500,000 (Direct Cost: ¥5,000,000、Indirect Cost: ¥1,500,000)
Fiscal Year 2007: ¥7,150,000 (Direct Cost: ¥5,500,000、Indirect Cost: ¥1,650,000)
|
Research Abstract |
This research project aimed at realization of terabit-scale transport protocol using theoretical and systematic approaches. Specifically, this research project focused on the three challenges : (1) establishment of fluid-based analysis techniques for transport protocols, (2) performance evaluation of transport protocols using fluid models, and (3) comparative study on congestion control frameworks for terabit-scale networks. Limitations of conventional transport protocols have been analyzed and clarified, and a novel terabit-scale transport protocol and a large-scale network simulator have been designed.
|