Budget Amount *help |
¥26,000,000 (Direct Cost: ¥20,000,000、Indirect Cost: ¥6,000,000)
Fiscal Year 2009: ¥3,250,000 (Direct Cost: ¥2,500,000、Indirect Cost: ¥750,000)
Fiscal Year 2008: ¥8,190,000 (Direct Cost: ¥6,300,000、Indirect Cost: ¥1,890,000)
Fiscal Year 2007: ¥14,560,000 (Direct Cost: ¥11,200,000、Indirect Cost: ¥3,360,000)
|
Research Abstract |
The construction of nano-structured materials with advanced functions by the self-organization of molecular building blocks is one of the key topics in modern material chemistry. In this work, polyoxometalate-based ionic crystals with controlled pore size, volume, and shape are synthesized, and their functions are presented.
|