Budget Amount *help |
¥3,540,000 (Direct Cost: ¥3,000,000、Indirect Cost: ¥540,000)
Fiscal Year 2009: ¥650,000 (Direct Cost: ¥500,000、Indirect Cost: ¥150,000)
Fiscal Year 2008: ¥1,690,000 (Direct Cost: ¥1,300,000、Indirect Cost: ¥390,000)
Fiscal Year 2007: ¥1,200,000 (Direct Cost: ¥1,200,000)
|
Research Abstract |
For image projection, we currently need a specialized white screen. As projectors have become popular, desires to utilize any flat walls as screens have been increasing. In this study, we proposed a compensation algorithm on basis of human perceptual characteristics in addition to projectors and walls characteristics. This study realized image projection on any flat walls in high consideration for viewers' impression of images.
|