Budget Amount *help |
¥3,380,000 (Direct Cost: ¥2,900,000、Indirect Cost: ¥480,000)
Fiscal Year 2009: ¥780,000 (Direct Cost: ¥600,000、Indirect Cost: ¥180,000)
Fiscal Year 2008: ¥1,300,000 (Direct Cost: ¥1,000,000、Indirect Cost: ¥300,000)
Fiscal Year 2007: ¥1,300,000 (Direct Cost: ¥1,300,000)
|
Research Abstract |
A purpose of this study is to clarify vulnerability of the hilly and mountainous area at the time of the disaster, and to consider whether it is connected for sustained reconstruction. I paid attention to relocation factors of settlements, a disaster recovery fund and a contribution, and considered the concept of the reconstruction plan, a development method, and examined a reconstruction plan based on a local characteristic.
|