Budget Amount *help |
¥1,440,000 (Direct Cost: ¥1,200,000、Indirect Cost: ¥240,000)
Fiscal Year 2009: ¥520,000 (Direct Cost: ¥400,000、Indirect Cost: ¥120,000)
Fiscal Year 2008: ¥520,000 (Direct Cost: ¥400,000、Indirect Cost: ¥120,000)
Fiscal Year 2007: ¥400,000 (Direct Cost: ¥400,000)
|
Research Abstract |
The purpose of this study is preparation for basic data of relicsexcavated from ancient tombs, which have not been treated for conservation yet, or whichhave not been prepared basic data like drawings and photographs. Measurement of relicsexcavated from Shichikan tumulus have progressed about half of the whole. Classificationand measurement of beads excavated from Otsukagoshi tumulus have been finished.Preparation for basic data of relics excavated from Hijirizuka tumulus has been finished.
|