Budget Amount *help |
¥3,750,000 (Direct Cost: ¥3,300,000、Indirect Cost: ¥450,000)
Fiscal Year 2009: ¥1,040,000 (Direct Cost: ¥800,000、Indirect Cost: ¥240,000)
Fiscal Year 2008: ¥910,000 (Direct Cost: ¥700,000、Indirect Cost: ¥210,000)
Fiscal Year 2007: ¥1,800,000 (Direct Cost: ¥1,800,000)
|
Research Abstract |
For the biofilm formed on river structures, as the effects of materials of the structures and the surrounding environments, detail flow structures on the different concrete surface of river works are measured experimentally and studied by means of flow visualization technique.
|