Budget Amount *help |
¥44,460,000 (Direct Cost: ¥34,200,000、Indirect Cost: ¥10,260,000)
Fiscal Year 2010: ¥10,530,000 (Direct Cost: ¥8,100,000、Indirect Cost: ¥2,430,000)
Fiscal Year 2009: ¥13,130,000 (Direct Cost: ¥10,100,000、Indirect Cost: ¥3,030,000)
Fiscal Year 2008: ¥20,800,000 (Direct Cost: ¥16,000,000、Indirect Cost: ¥4,800,000)
|
Research Abstract |
This study shows wood can be used as liquefaction and lateral flow countermeasure technique by collaboration study between civil engineering and forestry. To be concrete, the study revealed that wood piling can reduce liquefaction damage, environmental condition for decay of wood in the ground, quantitative reduction effects of greenhouse gases and a needed scenario to accomplish this method as the global warming prevention.
|