Project/Area Number |
20360194
|
Research Category |
Grant-in-Aid for Scientific Research (B)
|
Allocation Type | Single-year Grants |
Section | 一般 |
Research Field |
Civil engineering materials/Construction/Construction management
|
Research Institution | Kochi University of Technology |
Principal Investigator |
WATANABE Tsunemi Kochi University of Technology, 経営学部, 教授 (30240500)
|
Co-Investigator(Kenkyū-buntansha) |
OZAWA Kazumasa 東京大学, 大学院・工学系研究科, 教授 (80194546)
|
Project Period (FY) |
2008 – 2010
|
Project Status |
Completed (Fiscal Year 2010)
|
Budget Amount *help |
¥18,330,000 (Direct Cost: ¥14,100,000、Indirect Cost: ¥4,230,000)
Fiscal Year 2010: ¥5,200,000 (Direct Cost: ¥4,000,000、Indirect Cost: ¥1,200,000)
Fiscal Year 2009: ¥5,980,000 (Direct Cost: ¥4,600,000、Indirect Cost: ¥1,380,000)
Fiscal Year 2008: ¥7,150,000 (Direct Cost: ¥5,500,000、Indirect Cost: ¥1,650,000)
|
Keywords | 公共工事 / 技術調達 / 発注力 / リスクマネジメント / 地質リスク / くじ引き入札 / インドネシア公共調達 / 中国建設労働市場 / Best Value Approach / 発注方針 |
Research Abstract |
The objectives of this research are to clarify "ordering ability" for public owner and to propose procurement model of technology. The ordering ability, which should me maintained, is philosophy of trust such as consciousness of engineers, win-win attitude, development of standard, self-control, and appreciation of vendors' efforts. The ordering ability, which should be enhanced, is enhancement of transparency. To do that, it is necessary to clarify the relationship between project risk and cost, to develop and operate process management systems of project, to open this process to users and tax payers whenever needed, to introduce a new profession to complement functions that the public owner lacks, and to develop an evaluation scheme to select the party who can take each risk best.
|