Budget Amount *help |
¥19,240,000 (Direct Cost: ¥14,800,000、Indirect Cost: ¥4,440,000)
Fiscal Year 2011: ¥3,380,000 (Direct Cost: ¥2,600,000、Indirect Cost: ¥780,000)
Fiscal Year 2010: ¥4,030,000 (Direct Cost: ¥3,100,000、Indirect Cost: ¥930,000)
Fiscal Year 2009: ¥2,990,000 (Direct Cost: ¥2,300,000、Indirect Cost: ¥690,000)
Fiscal Year 2008: ¥8,840,000 (Direct Cost: ¥6,800,000、Indirect Cost: ¥2,040,000)
|
Research Abstract |
Firstly, necessary information and data were selected to estimate "micro-hydropower potential" of rivers and canals and methods were examined to correct the information and data. Continuously, it was developed an estimation approach to "micro-hydropower potential" using GIS data (alignment of water channels, grid elevation dataset and catchment geographical information) and flow-rate information (discharge and/or intake volume). Furthermore, it was examined to minimize information and data for applying the potential estimation, and to confirm an approach to calculate a distribution of small-hydropower potential on channels in large drainage basin, as a "small-hydropower potential Map" preparation approach. A part of research results was able to be applied to nationwide small-hydropower potential estimation by Ministry of the Environment.
|