Budget Amount *help |
¥4,420,000 (Direct Cost: ¥3,400,000、Indirect Cost: ¥1,020,000)
Fiscal Year 2010: ¥1,170,000 (Direct Cost: ¥900,000、Indirect Cost: ¥270,000)
Fiscal Year 2009: ¥1,300,000 (Direct Cost: ¥1,000,000、Indirect Cost: ¥300,000)
Fiscal Year 2008: ¥1,950,000 (Direct Cost: ¥1,500,000、Indirect Cost: ¥450,000)
|
Research Abstract |
In order to retrieve deformed images fast, we developed a method for approximating an image by a polynomial and realizing high-speed template matching with fixed position and aspect ratio. As an application of the developed method, a real-time system for acquiring images and retrieving objects was constructed. In concrete, as an intelligent transportation system, a system for detecting and recognizing a traffic light was developed.
|