Budget Amount *help |
¥4,550,000 (Direct Cost: ¥3,500,000、Indirect Cost: ¥1,050,000)
Fiscal Year 2010: ¥390,000 (Direct Cost: ¥300,000、Indirect Cost: ¥90,000)
Fiscal Year 2009: ¥1,950,000 (Direct Cost: ¥1,500,000、Indirect Cost: ¥450,000)
Fiscal Year 2008: ¥2,210,000 (Direct Cost: ¥1,700,000、Indirect Cost: ¥510,000)
|
Research Abstract |
This study was intended to utilize an optical illusion expression effect to the public space, a study from theoretical and productive both sides. Optical illusion is to stare and can confirm the effect. Therefore utilization long distance sign viewer side have to intend the passengers such as the train not by driver. Based on these findings, I could confirmed that run speed (around 90km per an hour), viewpoint distance (30-50m) were the most effective appropriate values. On the other hand, I presented masterpiece "Motion-illusion09, R & B .01" of 7m in width. In the inspection the expression effect in the public space of which "the street art people could enjoy with touch and see" by utilized an optical illusion effect. I was able to confirm of a new tool as the visual communication was possible, in the inspection of the expression effect in the public space.
|