Budget Amount *help |
¥4,290,000 (Direct Cost: ¥3,300,000、Indirect Cost: ¥990,000)
Fiscal Year 2011: ¥1,170,000 (Direct Cost: ¥900,000、Indirect Cost: ¥270,000)
Fiscal Year 2010: ¥650,000 (Direct Cost: ¥500,000、Indirect Cost: ¥150,000)
Fiscal Year 2009: ¥1,170,000 (Direct Cost: ¥900,000、Indirect Cost: ¥270,000)
Fiscal Year 2008: ¥1,300,000 (Direct Cost: ¥1,000,000、Indirect Cost: ¥300,000)
|
Research Abstract |
(1) We have developed a new method of historical study of "IPPEN HIJIRI E". (2) By scientific analysis of the pottery and painting materials and ruins and geographic information, that describes the structure of the surrounding landscape and Zenkoji of the Kamakura period. (3) Explained, that the port city is a binary structure of the coastal and inland. (4) Described for the first time a model of the city of Kamakura Period.
|