Budget Amount *help |
¥3,900,000 (Direct Cost: ¥3,000,000、Indirect Cost: ¥900,000)
Fiscal Year 2010: ¥1,170,000 (Direct Cost: ¥900,000、Indirect Cost: ¥270,000)
Fiscal Year 2009: ¥1,170,000 (Direct Cost: ¥900,000、Indirect Cost: ¥270,000)
Fiscal Year 2008: ¥1,560,000 (Direct Cost: ¥1,200,000、Indirect Cost: ¥360,000)
|
Research Abstract |
An environmental communication method is developed through which local residents and experts of environment collaboratively work on the betterment of local environment. Specifically, based on Scenario Workshop Method, one of the famous participatory technology assessment methods, participatory conference method is developed in which local residents collectively create a vision of desirable future environment through dialogue with experts of environment.
|