Budget Amount *help |
¥4,810,000 (Direct Cost: ¥3,700,000、Indirect Cost: ¥1,110,000)
Fiscal Year 2010: ¥650,000 (Direct Cost: ¥500,000、Indirect Cost: ¥150,000)
Fiscal Year 2009: ¥1,170,000 (Direct Cost: ¥900,000、Indirect Cost: ¥270,000)
Fiscal Year 2008: ¥2,990,000 (Direct Cost: ¥2,300,000、Indirect Cost: ¥690,000)
|
Research Abstract |
In this study, in order to preserve mural paintings in tumulus, we clarified effects of preservation measures, controlling environment and variation of the environment of Takamatsuzuka tumulus. Being based on the obtained results, we proposed other appropriate measures and method for controlling the environment to preserve the mural paintings. In addition, we proposed a method for controlling the air conditioning to reduce the risk of progressive deterioration on artifacts and remains of Tsugeyama tumulus.
|