Budget Amount *help |
¥4,810,000 (Direct Cost: ¥3,700,000、Indirect Cost: ¥1,110,000)
Fiscal Year 2010: ¥780,000 (Direct Cost: ¥600,000、Indirect Cost: ¥180,000)
Fiscal Year 2009: ¥650,000 (Direct Cost: ¥500,000、Indirect Cost: ¥150,000)
Fiscal Year 2008: ¥3,380,000 (Direct Cost: ¥2,600,000、Indirect Cost: ¥780,000)
|
Research Abstract |
This research is aimed to improve the performance and to accumulate the expertise on site of the developing system that is installed and operated at Natori campus of Sendai National College of Technology. The achievements are ; 1) System operation and making scenarios : installation, operation and measurement are executed. The model tuning and the description of the elements of user interface and the questionnaire for the occupants are done. 2) Development of the simplified system : simplified communication function between the system elements, less number of measuring points and changes of the schedule of equipment operation are provided.
|