• Search Research Projects
  • Search Researchers
  • How to Use
  1. Back to previous page

A study on the activity of Building and Repairs Department in Nagasaki Prefecture in Meiji Period.

Research Project

Project/Area Number 20560600
Research Category

Grant-in-Aid for Scientific Research (C)

Allocation TypeSingle-year Grants
Section一般
Research Field Architectural history/design
Research InstitutionUniversity of Fukui

Principal Investigator

TAKASHIMA Takeshi  University of Fukui, 大学院・工学研究科, 講師 (20115299)

Project Period (FY) 2008 – 2010
Project Status Completed (Fiscal Year 2010)
Budget Amount *help
¥2,470,000 (Direct Cost: ¥1,900,000、Indirect Cost: ¥570,000)
Fiscal Year 2010: ¥650,000 (Direct Cost: ¥500,000、Indirect Cost: ¥150,000)
Fiscal Year 2009: ¥650,000 (Direct Cost: ¥500,000、Indirect Cost: ¥150,000)
Fiscal Year 2008: ¥1,170,000 (Direct Cost: ¥900,000、Indirect Cost: ¥270,000)
Keywords官庁営繕 / 事務簿 / 請負工事 / 近代洋風建築 / 工事入札制度 / 請負契約 / 建築技術者
Research Abstract

「DAINIKA JIMUBO」 is a draft prepared and circulated by a person in charge to obtainthe sanction to a plan of Building and Repairs Department in Nagasaki Prefecture. Based on this 「DAINIKA JIMUBO」, we know the activity of this Department, and the main construction is NAGASAKI HOSPITAL and educational facilitiesbetween Meiji 30 and 37 Period. Many Architectural engineers in this Department changes from another Prefecture, that is a one of the facter of progressing of archi-tectural skill in this period.

Report

(4 results)
  • 2010 Annual Research Report   Final Research Report ( PDF )
  • 2009 Annual Research Report
  • 2008 Annual Research Report

URL: 

Published: 2008-04-01   Modified: 2016-04-21  

Information User Guide FAQ News Terms of Use Attribution of KAKENHI

Powered by NII kakenhi