Budget Amount *help |
¥24,960,000 (Direct Cost: ¥19,200,000、Indirect Cost: ¥5,760,000)
Fiscal Year 2010: ¥3,900,000 (Direct Cost: ¥3,000,000、Indirect Cost: ¥900,000)
Fiscal Year 2009: ¥9,230,000 (Direct Cost: ¥7,100,000、Indirect Cost: ¥2,130,000)
Fiscal Year 2008: ¥11,830,000 (Direct Cost: ¥9,100,000、Indirect Cost: ¥2,730,000)
|
Research Abstract |
In this study, experimental investigation and numerical analysis were performed for developing performance evaluation method of soil-cementitious materials. As degradation of cementitious materials, carbonation and leaching were discussed. Based on the analysis of relation among the mineral composition of binder, cement hydrated and other generated products, the formed micro pore structure, and the mass transport properties, the mechanism of the process of material degradation was evaluated.
|