Research Abstract |
A survey on the state of the art of software cost estimation studies and an analysis on the relation among effort, duration and software size were discussed as a preliminary study. Based on these discussions, the primary research target was set to focus on injection and detection of software defects which largely affect on both effort and duration. Software defect prediction models for a single project and a model for multiple concurrent projects were derived as the primary outcomes of this research project.
|