Budget Amount *help |
¥4,290,000 (Direct Cost: ¥3,300,000、Indirect Cost: ¥990,000)
Fiscal Year 2011: ¥1,040,000 (Direct Cost: ¥800,000、Indirect Cost: ¥240,000)
Fiscal Year 2010: ¥780,000 (Direct Cost: ¥600,000、Indirect Cost: ¥180,000)
Fiscal Year 2009: ¥1,040,000 (Direct Cost: ¥800,000、Indirect Cost: ¥240,000)
Fiscal Year 2008: ¥1,430,000 (Direct Cost: ¥1,100,000、Indirect Cost: ¥330,000)
|
Research Abstract |
Using diagnostic-type biosphere model BEAMS, I analyzed terrestrial carbon fluxes with 1km grid resolution over Far East Asia. As a result of a comparison between model estimations and observations at tower fluxes, I confirmed a validity of water, energy and carbon fluxes estimated by BEAMS. I could demonstrate in regional scale analyses spatial and temporal patterns in gross primary production, net primary production, and net ecosystem production, and the changes in response to climate events.
|