Budget Amount *help |
¥2,730,000 (Direct Cost: ¥2,100,000、Indirect Cost: ¥630,000)
Fiscal Year 2009: ¥1,170,000 (Direct Cost: ¥900,000、Indirect Cost: ¥270,000)
Fiscal Year 2008: ¥1,560,000 (Direct Cost: ¥1,200,000、Indirect Cost: ¥360,000)
|
Research Abstract |
This research project aims at elucidating how scale structures (a set of degrees) are manifested in the semantics of various linguistic expressions, including prepositions and verbs (especially change of state/location verbs). The analysis is given by the compositional semantics, which tries to map a syntactic structure directly to its semantic representation. The key to the analyses in both prepositions and verbs is the distribution of measure phrases.
|