Budget Amount *help |
¥2,730,000 (Direct Cost: ¥2,100,000、Indirect Cost: ¥630,000)
Fiscal Year 2010: ¥650,000 (Direct Cost: ¥500,000、Indirect Cost: ¥150,000)
Fiscal Year 2009: ¥1,170,000 (Direct Cost: ¥900,000、Indirect Cost: ¥270,000)
Fiscal Year 2008: ¥910,000 (Direct Cost: ¥700,000、Indirect Cost: ¥210,000)
|
Research Abstract |
This study is main by the investigation into each Chinese engine, six times in total made a voyage, take a picture and measure pottery models and relief bricks, thereby, made a database. On this occasion, I visit the tomb in during excavation, confirm the situation of a pottery model's discovery. Based on this investigation, I push forward basic archeology analysis, furthermore, refer history documents and folk documents, performed a general study. As the result of this study, I announced six articles and gave presentations at the meeting eight times, and made it and published a general report in the last year.
|