• Search Research Projects
  • Search Researchers
  • How to Use
  1. Back to previous page

Study of ultra-fast beam diagnostic and operation system in next generation high intensity and multi-purpose accelerators

Research Project

Project/Area Number 20740157
Research Category

Grant-in-Aid for Young Scientists (B)

Allocation TypeSingle-year Grants
Research Field Particle/Nuclear/Cosmic ray/Astro physics
Research InstitutionHigh Energy Accelerator Research Organization

Principal Investigator

SATOH Masanori  High Energy Accelerator Research Organization, 加速器研究施設, 助教 (90353367)

Project Period (FY) 2008 – 2009
Project Status Completed (Fiscal Year 2009)
Budget Amount *help
¥4,420,000 (Direct Cost: ¥3,400,000、Indirect Cost: ¥1,020,000)
Fiscal Year 2009: ¥1,690,000 (Direct Cost: ¥1,300,000、Indirect Cost: ¥390,000)
Fiscal Year 2008: ¥2,730,000 (Direct Cost: ¥2,100,000、Indirect Cost: ¥630,000)
Keywords加速器 / フィードバック / 高速シミュレーション / 線形加速器 / 同時入射
Research Abstract

In this research, the ultra-fast beam diagnostic and operation system for next-generation high intensity and multi-purpose accelerators has been studied. We get the knowledge related to the feasibility of the application of the high-efficient feedback operation using the on-line beam simulation and fast diagnostic system to real beam operation.

Report

(3 results)
  • 2009 Annual Research Report   Final Research Report ( PDF )
  • 2008 Annual Research Report

URL: 

Published: 2008-04-01   Modified: 2016-04-21  

Information User Guide FAQ News Terms of Use Attribution of KAKENHI

Powered by NII kakenhi